LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
|
|
|
- August Lucas
- 9 years ago
- Views:
Transcription
1 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially by 30 ft and to a total of 42 feet as demand requires. 2. Replace the 85-year-old Sugar Hollow pipeline with a newer, shorter pipeline connecting the South Fork Rivanna Reservoir with the Ragged Mountain Reservoir and the two corresponding treatment plants. Can be used to transfer water from South Fork to Ragged Mountain during wet periods or from Ragged Mountain back the larger South Fork Treatment Plant during dry periods. 3. Upgrade and expand water treatment plants. 4. Provides enough water storage to get us through drought for the next 50 years WHY DOES THE LEAGUE SUPPORT THE ADOPTED COMMUNITY WATER SUPPLY PLAN? 1. WE NEED MORE WATER STORAGE We have a water storage problem, not a water quantity problem. Our average annual rainfall is adequate but we are subject to droughts. More storage is needed to provide water for people and rivers during dry times. The expanded reservoir at Ragged Mountain will store an additional 1.1 billion gallons of water allowing us to draw water from the reservoir instead of rivers during dry times when river flows are down. With the expanded reservoir, we won't have to sacrifice our rivers for people. Dredge the South Fork Reservoir-Only Option supported by many opponents of the dam calls for dredging the South Fork Rivanna Reservoir back to storage levels of 1966, and simply repairing the unsafe 100 year old Ragged Mountain dam. This produces only 151 million gallons of water storage. This is not enough to meet our water needs. 2. THE OLD RAGGED MOUNTAIN DAM POSES SAFETY CONCERNS We have a serious safety issue at Ragged Mountain Dam. The 100 year old dam must be replaced, and soon. Fixing the dam adds no new storage. Replacing the dam and raising the pool level 30 ft provides our community water needs for the next 20 years. 3. WE NEED TO CARE FOR THE ENVIRONMENT a. RESTORE AND PROTECT RIVER FLOWS For many years we have been withdrawing too much water from our rivers during dry seasons. This damages not only the depleted river but the entire river system (watershed). The Approved Plan produces enough water storage so that we can rely on reservoir water rather than rivers during dry times.
2 2 Under the Approved Plan, life sustaining flows will be restored to the Moormans River allowing it to flow naturally 97% of the time. The plan sets in place withdrawal limits for South Fork River which together with increased flows from the Moormans will increase the level of the Rivanna River through the City of Charlottesville during dry summer months. Figure1. The water from this small spigot is what we share with the Moormans River during dry times b. IMPACT ON RAGGED MOUNTAIN AREA Approximately 150 acres of trees will be cut and small streams coming into the reservoir will be inundated. Approximately 50 acres of these trees will be replanted. To offset these impacts, a mitigation plan has been developed which provides permanent riparian protection to 75,000 linear feet of streams in the South Fork Rivanna watershed, provides for 200 acres of new riparian forest and wildlife habitat, relocates and lengthens existing walking trails around the reservoir, and provides for four acres of new wetlands adjacent to the southeastern boundary of
3 3 the City along Moore s Creek. The new lake will provide 142 acres of new water surface for additional lacustrine aquatic habitat and passive recreation. The reservoir expansion will change the ratio of forest to lake at the Ragged Mountain Area with surrounding conservation easements from 95% forest : 5% lake to 90% forest : 10% lake. Figure 2. Aerial view of the Ragged Mountain Area showing extent of future inundation. Note that there is no river entering this small watershed. The majority of the water in this pool is presently piped from the Moormans River 14 miles to the west.
4 4 Figure 3. The shaded area shows the 260 square mile drainage area of the South Fork Rivanna River, the South Fork Treatment Plant, the Observatory Hill Treatment Plant and the new pipeline connecting the South Fork with Ragged Mountain Reservoirs. 4. THE ADOPTED PLAN COSTS LESS THAN ALTERNATIVES Phase1of the approved plan: $23 million for the new dam gives 1.1 billion gallons storage. The Ragged Mountain Reservoir will not need to be dredged because of its small drainage area and wooded landscape. Dredge the South Fork Reservoir-only option supported by some opponents of the dam: $36 million for 151 million gallons storage and no additional water supply for river protection. Storage is temporary as sediment continues to flow into this long shallow river reservoir due to its large drainage area and agricultural and suburban landscapes.
5 5 Phase 2 of the approved plan: Replacement of the 85 year old Sugar Hollow Pipeline with the shorter pipeline from the South Fork to the Ragged Mountain Reservoir is tentatively scheduled for 2021 and is estimated to cost $53 million. This will allow us to skim high flows during the rainy season from South Fork Rivanna River to fill the Ragged Mountain Reservoir. The new pipeline adds efficiency and value to the system by establishing a two way connection between our major reservoirs and two water treatment plants. Because of this, the first phase of the new reservoir with the pipeline is expected to supply adequate water during drought to the year Opponents of the plan have pushed for replacing the Sugar Hollow Pipeline instead. This option is estimated to cost $43 million (as per 2011 ACSA estimate). Because it takes water from one small tributary of the Rivanna, it provides no new capacity. It also does not provide back-andforth integration of the reservoirs and treatment plants. Phase 3 of the approved plan: $1.6 million (2011 dollars) to put the additional 12 ft on the new Ragged Mountain Dam. This is predicted to provide needed water until at least Phasing makes the plan financially feasible. The plan approved by City and County in 2006 phased the 2 key components of the plan, the expansion of Ragged Mountain Reservoir and the replacement of the 85 year old, unreliable Sugar Hollow pipeline with a shorter South Fork to Ragged Mountain Reservoir pipeline. The new dam is to be built first followed with the pipeline by This 2006 phasing decision was done for financial reasons. It is more cost effective to build the dam to its full height in one construction project and the dam and the pipeline were too expensive to build at the same time. The City later asked that the dam be built in two phases because not all the storage would be needed in the first few decades. In 2011 the County agreed to this change. There is no financial incentive for this additional phase.
ANGORA FIRE RESTORATION PROJECT
ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
FOUR RIVERS RESTORATION PROJECT
MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
How To Manage Water Resources In The Yakima Basin
Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS
TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS Dirksen Senate Office Building, Room 628 White Mountain
A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1
A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased
Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
CHAPTER I: INTRODUCTION. Background
CHAPTER I: INTRODUCTION Background California State Law requires each county to adopt a General Plan for the physical development of the county and any land outside its boundaries which bears relation
U.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing
N A T U R A L R E S O U R C E C O N S E R V A T I O N As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing conservation
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia
Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:
Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About?
Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About? Conserve to Enhance (C2E) was originally conceptualized as an approach to giving the environment a seat at the table
4. Priority Areas of Conservation
4. Priority Areas of Conservation A. SIGNIFICANT RESOURCE AREAS This Open Space and Farmland Plan identifies the key issues facing open space and agricultural resources in the Town, highlights the location
Alternative (Flexible) Mitigation Options Proposed Rule - Revised
Alternative (Flexible) Mitigation Options Proposed Rule - Revised NC Association of Environmental Professionals June 9, 2011 Background Purposes Update rules due to required changes from statutes Put all
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
City of Fort Collins Water Supply and Demand Management Policy
City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston
Oregon. Climate Change Adaptation Framework
Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate
MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1
MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 Mitigation Goals and Objectives o Describe functions lost at impact site o Describe functions to be gained at mitigation site o Describe overall watershed
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
4.2 Buena Vista Creek Watershed
Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately
Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how
DRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
7.0 Stream Restoration
7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational
Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop
Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Welcome to the Mission Reach! The Mission Reach Ecosystem Restoration and Recreation Project is transforming
Leveraging Ohio s Clean Water SRF Program to Fund Stream and Wetland Restoration and Protection Projects
Leveraging Ohio s Clean Water SRF Program to Fund Stream and Wetland Restoration and Protection Projects Association of State Wetland Managers 2014 State/Tribal/Federal Coordination Meeting Shepherdstown,
Increasing water availability through juniper control.
Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 [email protected] Increasing water availability through juniper control. Throughout the region
The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues
The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary Water Flows & Current Issues Florida Governor Rick Scott August 20, 2013 Upper Chain of Lakes
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
The Dungeness Water Exchange Mitigation Guidance Document. April 2013
The Dungeness Water Exchange Mitigation Guidance Document April 2013 Prepared by Washington Water Trust 1530 Westlake Avenue N, Suite 400 Seattle, WA 9810 Table of Contents- Dungeness Water Exchange Mitigation
18 voting members 44 stakeholders 114 email list. Senators: Wyden & Merkley Representative DeFazio
18 voting members 44 stakeholders 114 email list Senators: Wyden & Merkley Representative DeFazio State Representative Krieger State Senators: Roblan, Johnson, and Kruse Governor Brown s office County
Addendum D. Nomination of Moody Wash ACEC
Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a
South Fork Rivanna Reservoir and Watershed. Reflecting on 36 Years, Anticipating 50 years EXPANDED SUMMARY. Stephen P. Bowler Watershed Manager
South Fork Rivanna Reservoir and Watershed Reflecting on 36 Years, Anticipating 50 years EXPANDED SUMMARY Stephen P. Bowler Watershed Manager Prepared for Rivanna Water and Sewer Authority Albemarle County
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy
Case Study Mokelumne Watershed, CA and Santa Fe, NM Avoided Costs: The Economics of Watershed Restoration Forested headwaters are the source of much of the West s drinking water. Protecting and restoring
Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
Determination of NEPA Adequacy (DNA)
DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR 97526 Determination of NEPA Adequacy (DNA) Office: Grants
Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives
Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we
Bowmanville Marsh Habitat Restoration and Public Access Project
Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration
The North State: Implementing the California Water Action Plan February 24, 2014
The North State: Implementing the California Water Action Plan February 24, 2014 The North State Water Alliance applauds Governor Brown s California Water Action Plan (Action Plan) and his call for comprehensive
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy [email protected]
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy [email protected] Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act
Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)
Green Infrastructure Case Study Template
Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.
This document is scheduled to be published in the Federal Register on 12/24/2014 and available online at http://federalregister.gov/a/2014-30158, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute
Healthy Forests Resilient Water Supply Vibrant Economy Ecological Restoration Institute How Water Gets to Your Home MOST OF THE VALLEY S WATER SUPPLY comes from winter precipitation and runoff from Arizona
THE 4 MAJOR RIVERS RESTORATION PROJECT
MLTM Republic of Korea WATER IN THE GREEN ECONOMY IN PRACTICE: TOWARDS RIO+20 WATER & GREEN GROWTH THE 4 MAJOR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea 3 to 5 October 2011
The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater
The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater stream flowing into the Indian River Lagoon. An inlet
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
Post-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE
Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE
Chapter 9. Selected Watershed Initiatives in the Great Basin Region
Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA
IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA David Chastant AUTHORS:DeKalb County, 330 West Ponce De Leon Ave, Decatur, Georgia 30030 REFERENCE:Proceedings
How To Preserve Trees
San Diego County Water Authority Vic Bianes, PE - Engineering Manager Tad Brierton, SR/WA - Right of Way Supervisor APWA National Congress 2013 Chicago, IL 2 1 Background - San Diego County Water Authority
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT
13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT A. Existing Conditions Ramsey is fortunate to have an ample amount of natural resources and open space areas and a community attitude that is increasingly
Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
Emergency Conservation Program
Materials Prepared for Federation of Southern Cooperatives Epes, Alabama September 11, 2009 Emergency Conservation Program by Karen R. Krub Farmers Legal Action Group, Inc. 360 North Robert Street, Suite
