Project Management Fact Sheet:
|
|
|
- Belinda Fletcher
- 10 years ago
- Views:
Transcription
1 Project Management Fact Sheet: Developing a Risk Management Plan Version: 1.4, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that this material should not be relied upon by any other person. Furthermore, to the extent that this material is relied upon, the Crown in Right of the State of Tasmania gives no warranty as to the accuracy or correctness of the material or for any advice given or for omissions from the material. Users rely on the material at their own risk. Inter Agency Policy and Projects Unit Department of Premier and Cabinet
2 What is Risk? In the context of project management, risk refers to any factor (or threat) that may affect adversely the successful completion of the project in terms of delivery of its outputs and securing of outcomes, or adverse effects on resourcing, time, cost and quality. These factors/threats include risks to the project s business environment that may prevent the project s outcomes from being realised fully. There are always risks associated with a project. The purpose of risk management is to ensure levels of risk and uncertainty are properly managed so that the project is successfully completed. It enables those involved to identify possible risks, the manner in which they can be contained and the likely cost of mitigation strategies. What is a Risk Management Plan? A Risk Management Plan summarises the proposed risk management approach for the project and is usually included as a section in the Project Business Plan. For larger or complex projects it can be maintained as a separate document. Refer to the Risk Management Plan template for more information. It is dependent upon the establishment of a Risk Register. At a minimum, the Risk Management Plan should cover: the process which will be used to identify, analyse, evaluate and treat risks both initially and throughout the life of the project, including estimated costings the process for transferring approved risk costings into the project budget the process for transferring risk mitigation strategies into the project Work Breakdown Structure how often the Risk Register will be reviewed, the process for review and who will be involved who will be responsible for which aspects of risk management how Risk Status will be reported and to whom include as an appendix the initial snapshot of the major risks, current gradings, planned mitigation strategies and costings, and who will be responsible for implementing them (these are usually included as an Appendix in the Risk Register) What is a Risk Register? The Risk Register records details of all the risks identified at the beginning and during the life of the project, their grading in terms of likelihood of occurring and seriousness of impact on the project, initial plans for mitigating each high level risk, the costs and responsibilities of the prescribed mitigation strategies, and subsequent results. Refer to the Project Risk Register template for more information. It usually includes: a unique identifier for each risk a description of each risk and how it will affect the project an assessment of the likelihood it will occur and the possible seriousness/impact if it does occur (low, medium, high) a grading of each risk according to a risk assessment table (see Table 1) who is responsible for managing the risk an outline of proposed mitigation actions (preventative and contingency) in larger projects, costings for each mitigation strategy This Register should be kept throughout the project, and will change regularly as existing risks are re-graded in the light of the effectiveness of the mitigation strategy and new risks are identified. In smaller projects the Risk Register is often used as the Risk Management Plan. Page 2
3 Why would you develop a Risk Management Plan and Risk Register? A Risk Management Plan and Risk Register are developed to: provide a useful tool for managing and reducing the risks identified before and during the project document risk mitigation strategies being pursued in response to the identified risks and their grading in terms of likelihood and seriousness provide the Project Sponsor, Steering Committee/senior management with a documented framework from which risk status can be reported upon ensure the communication of risk management issues to key stakeholders provide a mechanism for seeking and acting on feedback to encourage the involvement of the key stakeholders identify the mitigation actions required for implementation of the plan and associated costings When would you develop a Risk Management Plan? Initial risks must be identified and graded according to likelihood and seriousness very early in the project. This initial risk assessment will form part of the Project Proposal or Project Business Case for the project. Once the project is approved the Risk Management Plan and Risk Register should be fully developed. In the case of smaller projects the Risk Register may serve both purposes. Knowledge and understanding of appropriate types of risk management activities, or where to obtain them Any of the following optional documents Project Proposal, Project Business Case, or Project Business Plan Optional: Departmental Project Management Guidelines Corporate/Business Plan for the Department/Business Unit How do you develop a Risk Management Plan? The following is one way to develop your plan. It consists of a series of steps that become iterative throughout the life of your project. Step 1: Identify the risks Before risks can be properly managed, they need to be identified. One useful way of doing this is defining categories under which risks might be identified. For example, categories might include Corporate Risks, Business Risks, Project Risks and System Risks. These can be broken down even further into categories such as environmental, economic, human, etc. Another way is to categorise in terms of risks external to the project and those that are internal. (Refer to generic sources of risk as described in Appendix D of the Australian Standard for Risk Management AS/NZS 4360: 2004) What you need before you start: Knowledge and understanding of the project Knowledge and understanding of the Key Stakeholders Page 3
4 For a medium to large project, start by conducting a number of meetings or brainstorming sessions involving (as a minimum) the Project Manager, Project Team members, Steering Committee members and external key stakeholders. It is often advisable to use an outside facilitator for this. Preparation may include an environmental scan, seeking views of key stakeholders etc. One of the most difficult things is ensuring that all major risks are identified. For a small project, the Project Manager may develop the Risk Register perhaps with input from the Project Sponsor/Senior Manager and colleagues, or a small group of key stakeholders. The results of this exercise should be documented in a Risk Register for the project. For larger projects, if an outside facilitator is used, it would be expected that they would develop the initial documentation. Step 2: Analyse and evaluate the Risks Once you have identified your risks you should analyse them by determining how they might affect the success of your project. Risks can result in four types of consequences: benefits are delayed or reduced timeframes are extended outlays are advanced or increased output quality (fitness for purpose) is reduced Risks should be analysed and evaluated in terms of likelihood of occurring and seriousness of impact if they do occur. Firstly, assess the likelihood of the risk occurring and give this a rating of Low (L), Medium (M) or High (H) likelihood. Once you have rated the likelihood, assess the seriousness of the impact of the risk if it did occur and rate at Low (L), Medium (M) or High (H) seriousness. Using your ratings for likelihood and seriousness you can then determine a current grading for each risk that in turn provides a measure of the project risk exposure at the time of the evaluation. Table 1: Risk matrix for grading risks Grade: Combined effect of Likelihood/Seriousness Likelihood Seriousness low medium high low N D C medium D C B high C B A Table 1 provides a standard method for calculating a grading for each risk based upon the combination of the likelihood and seriousness ratings. Page 4
5 So what this means in practice is: Id Description of Risk Likelihood Seriousness Grade Change 1.1 Inadequate funding to complete the project 1.2 Lack of technical skills in Client Business Unit medium medium C high high A NEW Key: Change to Grade since last assessment NEW New risk Grading decreased No change to Grade Grading increased In the case of larger or more complex projects, the matrix should be expanded to ensure an A Grading is automatically assigned to any risks defined as extremely high seriousness. Grade: Combined effect of Likelihood/Seriousness Seriousness Likelihood low medium high EXTREME low N D C A medium D C B A high C B A A Depending upon the size and nature of the project, some choose to use numerical scales for this analysis and evaluation. The resulting grades of risk help the project team to focus on treating the most important risks, once evaluated and prioritised, and to mitigate them before the project progresses much further into the MANAGE Phase. Step 3: How will you manage or treat the Risks? Using the Grading Table in Step 3, for your entire Grade A and B risks and those rated Extreme it is really important to have identified mitigation strategies very early in your project. Risk mitigation strategies reduce the chance that a risk will be realised and/or reduce the seriousness of a risk if it is realised. Grade C risks should be continually monitored and have planned mitigation strategies ready to be implemented if appropriate. These plans need to be recorded on your Risk Register. There are two broad types of risk mitigation strategies: Preventative - planned actions to reduce the likelihood a risk will occur, and the seriousness if it does occur. In other words, what should you do now? Page 5
6 Contingency - planned actions to reduce the seriousness of the risk if it does occur. In other words, what should you do if? Once a risk has occurred, recovery actions to allow you to move on should be built into the work breakdown structure for your project. In other words, what should you do when? For each action in the Risk Register, it is necessary to specify: Who will be responsible for implementing each action? When the action must be implemented? What are the costs associated with each action (for larger projects in particular)? Your Risk Register may now look something like this: Id Description of Risk 1.1 Inadequate funding to complete the project 1.2 Lack of technical skills in Client Business Unit L S G Change Date Action Who Cost WBS M M C Re-scope project focussing on time and resourcing H H A NEW Develop training plan PM $$$ Consultant $$$ This example is in brief and more detail would be added as required. For example, in larger projects separate documentation might be developed for each major risk providing much more detail regarding mitigation strategies and costings. (Refer to the Project Management Knowledge Base for examples of a Risk Register) Step 4: Monitor and review risks The Risk Register should be visited fortnightly with re-evaluation of the risks occurring on a monthly basis. If your prevention strategies are being effective, some of your Grade A and B risks should be able to be downgraded fairly soon into the project. Risk status should be reported to the Steering Committee or Project Sponsor/Senior Manager on an agreed regular basis and form part of the Project Status reporting processes. Remember - Risk Management is an iterative process that should be built into the management processes for your project. It is closely linked with your Issues Management processes, as untreated issues may become significant risks. Also remember: Communicate and Consult Even though you may have done this really well at the beginning and involved your key stakeholders in the identification, analysis and evaluation of risks, it is important to remember to keep the communication going. The communication strategy for your project should build this into the activities. Who is responsible? Many people involved in a project will have some responsibility for project risk management, including the project team members, Steering Committee, Project Sponsor, potential business owners and working groups. It is important that they know what they are watching out for, and reporting potential risks is a significant part of their role. The Project Manager is responsible for monitoring and managing all aspects of the risk management process, such as: Page 6
7 the development of the Risk Management Plan and Risk Register the continual monitoring of the project to identify any new or changing risks implementation of the planned mitigation strategies continual monitoring of the effectiveness of the Risk Management Plan regular reports on the status of risks to the Project Sponsor and Steering Committee In large projects, the Project Manager may choose to assign risk management activities to a separate Risk Manager, but they should still retain responsibility. It should be noted that large projects are a risk in themselves, and the need for the Project Manager to reassign this integral aspect of project management may be an indication that the project should be rescoped, or divided into several subprojects overseen by a Project Director. Who has ultimate accountability? While the Project Manager is responsible for the management of risks, the Project Sponsor/Senior Manager has ultimate responsibility to ensure that an effective Risk Management Plan for the project is in place. Generally, the Risk Management Plan would be approved or endorsed by the Steering Committee/Project Sponsor or Senior Manager, depending upon the size of the project. Once the Risk Management Plan has been approved, it is important to: add the actions into the Project Business Plan with the appropriately assigned resource(s) add the costs for the actions into the Project Budget Where to get additional help Refer to the Tasmanian Government Project Management Guidelines Refer to the Risk Identification Tool The Project Management Knowledge Base The Inter Agency Policy and Projects Unit offers further advice and assistance, including a formal Advisory and Review Service Contact Project Services at [email protected] Further information and resources are available from Who approves the Risk Management Plan? Acknowledgements This Fact Sheet contains elements of the Tasmanian Government Project Management Guidelines prepared by the Department of Premier and Cabinet. Elements of this Fact Sheet have been derived from the Australian Standard AS/NZS 4360:2004. Page 7
Project Management Frequently Asked Questions:
Project Management Frequently Asked Questions: Risk Management Version:1.4, November 2008 Inter Agency Policy and Projects Unit Department of Premier and Cabinet What are the benefits of risk management?
Project Management Fact Sheet:
Project Management Fact Sheet: Developing a Work Breakdown Structure Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities.
Project Management Fact Sheet:
Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that
Project Management Fact Sheet:
Project Management Fact Sheet: Developing a Gantt Chart Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows
Project Management Fact Sheet: Developing a Gantt Chart
Project Management Fact Sheet: Developing a Gantt Chart March 2006 What is a Gantt Chart? The Gantt Chart is a horizontal bar chart. It shows the project activities and tasks in sequential order with the
Project Management Fact Sheet:
Project Management Fact Sheet: Document Control Version: 1.3, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that this
Project Management Fact Sheet:
Project Management Fact Sheet: Steering Committee nuts and bolts Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It
Project Management Guidelines
Tasmanian Government Project Management Guidelines Version 7.0 (July 2011) Department of Premier and Cabinet Publisher and Editor: Office of egovernment Department of Premier and Cabinet Tasmania Acknowledgments:
Risk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT
RISK MANAGEMENT PLAN FOR THE PROJECT Prepared by: Approved by: Reference: Version: Date: INTRODUCTION This document is the Risk Management
Avondale College Limited Enterprise Risk Management Framework 2014 2017
Avondale College Limited Enterprise Risk Management Framework 2014 2017 President s message Risk management is part of our daily life, something we do regularly; often without realising we are doing it.
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010
Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0
How To Manage A Project
Realising Project Benefits Staff Management Plan Version 1.0 (2/10/07) Inter Agency Policy and Projects Unit Department of Premier and Cabinet Acknowledgements The contribution of the following individuals
To provide a procedure and associated guidelines to facilitate the management of project dependencies.
Management DEPENDENCY MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project dependencies. Overview Dependencies in this Phase are defined as actions,
Creating A Risk Management Plan
Creating A Risk Management Plan A presentation based on the concepts taught in the Risk Management 1A course. Carlos Consulting Group Roseville, CA. (916) 521-2520 www.carlosconsulting.com 1 Objectives
Queensland State Archives. Strategic Recordkeeping Implementation Plan Workbook
Queensland State Archives Strategic Recordkeeping Implementation Plan Workbook 1 Document Details Version 1 Version 1.01 Version 2 21 March 2002: Released to State and Local Authorities 9 January 2003:
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
Enterprise Risk Management Framework 2012 2016. Strengthening our commitment to risk management
Enterprise Risk Management Framework 2012 2016 Strengthening our commitment to risk management Contents Director-General s message... 3 Introduction... 4 Purpose... 4 What is risk management?... 4 Benefits
POL ENTERPRISE RISK MANAGEMENT SC51. Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT:
POL ENTERPRISE RISK MANAGEMENT SC51 POLICY CODE: SC51 DIRECTORATE: Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT: Executive Support Services RESPONSIBLE OFFICER:
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES
RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES GOVERNMENT ACCOUNTING SECTION DEPARTMENT OF FINANCE MARCH 2004 Risk Management Guidance CONTENTS Pages List of guidelines on risk management
GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES
Level 37, 2 Lonsdale Street Melbourne 3000, Australia Telephone.+61 3 9302 1300 +61 1300 664 969 Facsimile +61 3 9302 1303 GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES ENERGY INDUSTRIES JANUARY
Risk/Issue Management Plan
Risk/Issue Management Plan Centralized Revenue Opportunity System November 2014 Version 2.0 This page intentionally left blank Table of Contents 1. Overview... 3 1.1 Purpose... 3 1.2 Scope... 3 2. Roles
1.20 Appendix A Generic Risk Management Process and Tasks
1.20 Appendix A Generic Risk Management Process and Tasks The Project Manager shall undertake the following generic tasks during each stage of Project Development: A. Define the project context B. Identify
Project Risk Management. Presented by Stephen Smith
Project Risk Management Presented by Stephen Smith Introduction Risk Management Insurance Business Financial Project Risk Management Project A temporary endeavour undertaken to create a unique product
Victorian Government Risk Management Framework. March 2015
Victorian Government Risk Management Framework March 2015 This document reproduces parts of the AS/NZS ISO 31000:2099 Risk Management Principles and Guidelines. Permission has been granted by SAI Global
A checklist for project managers
A checklist for project managers The checklist presented below aims to help you decide what project documents are needed, approximately when you need to create them, and what other resources are available.
A Risk Management Standard
A Risk Management Standard Introduction This Risk Management Standard is the result of work by a team drawn from the major risk management organisations in the UK, including the Institute of Risk management
The Lowitja Institute Risk Management Plan
The Lowitja Institute Risk Management Plan 1. PURPOSE This Plan provides instructions to management and staff for the implementation of consistent risk management practices throughout the Lowitja Institute
1. Background and business case
1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons
Risk management framework
Risk management framework Security classification: PUBLIC Reference number: DSITI:FW:001P Policy owner: Executive Director, Strategic Transformation & Performance Contact officer: Principal Consultant,
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
ORDINANCE 22 UNIVERSITY OF LONDON RISK MANAGEMENT POLICY
UNIVERSITY OF LONDON RISK MANAGEMENT POLICY Introduction 2 Guide to Risk Management 2 Underlying approach to Risk Management 2 Components of the Risk Management Framework 3 Role and Responsibilities of
Process Improvement Plan
Doc ID: Date: Revision: Status: Abstract This document describes the process improvement plan for Company XXX. Approvals Approvals. Signed. Date. Author Page 2 of 19 Sample Process Improvement Plan.doc
Drafting a business plan
How are you going to do it? Drafting a business plan Background A business plan sets out the business case for a particular project, organisation or venture. It states how you will go about running a specific
POLICY : CORPORATE RISK MANAGEMENT
APPENDIX 5 POLICY : CORPORATE RISK MANAGEMENT 1 Scope This is a Service wide policy. 2 Aims and Objectives Lancashire Combined Fire Authority provides services to a diverse range of people and organisations,
Confident in our Future, Risk Management Policy Statement and Strategy
Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents
Information Management Advice 39 Developing an Information Asset Register
Information Management Advice 39 Developing an Information Asset Register Introduction The amount of information agencies create is continually increasing, and whether your agency is large or small, if
Issue Management Plan Preparation Guidelines
Issue Management Plan Preparation Guidelines TABLE OF CONTENTS 1. Purpose of Document 1 2. Definition of Issue Management 1 3. Objectives of Issue Management 1 4. Terms, Acronyms and Abbreviations 1 5.
Report to Parliament No. 4 for 2011 Information systems governance and security. Financial and Assurance audit. Enhancing public sector accountability
Financial and Assurance audit Report to Parliament No. 4 for 2011 Information systems governance and security ISSN 1834-1128 Enhancing public sector accountability RTP No. 4 cover.indd 1 15/06/2011 3:19:31
Xavier Catholic College Risk Management - Policy & Procedure
Xavier Catholic College Risk Management Policy 18 March 2013 Sourced from CSOHS Online. Source CSO Broken Bay 2012 Page 1 Risk Management Policy (Draft) PURPOSE Risk management is the culture, processes
State Records Guideline No 25. Managing Information Risk
State Records Guideline No 25 Managing Information Risk Table of Contents 1 Introduction... 4 1.1 Purpose... 4 1.2 Authority... 4 2 Risk Management and Information... 5 2.1 Overview... 5 2.2 Risk management...
Project Management. James M. Conrad
Project Management James M. Conrad Outline Introduction Motivation The Importance of Project Management Basic Skills of Project Management Exercise Recap and Discussion Project (from Wikipedia) A project
RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT
RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) Risk should be defined as An uncertain event that, should it occur, would have an effect (positive or negative) on the project or business objectives.
Project Risk Management
Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management
IT Project Management Methodology. Project Risk Management Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Risk Management Guide Version 0.3 Project Risk Management Support Guide version 0.3 Page 1 Version Date Author
Appendix V Risk Management Plan Template
Appendix V Risk Management Plan Template Version 2 March 7, 2005 This page is intentionally left blank. Version 2 March 7, 2005 Title Page Document Control Panel Table of Contents List of Acronyms Definitions
Risk Management Framework
Risk Management Framework THIS PAGE INTENTIONALLY LEFT BLANK Foreword The South Australian Government Risk Management Policy Statement 2009 advocates that consistent and systematic application of risk
Revised Risk Management Policy and Framework. Report by Head of Finance
Audit Committee 29 April 2010 Item No 7 Revised Risk Management Policy and Framework Report by Head of Finance Summary A substantial review of our current Risk Management Strategy has been carried out.
Risk Management Framework
Risk Management Framework Category or Type Originally approved by, and date Administration and Management Vice Chancellor at VCAG on December 2008 Last approved revision October 2011 Sponsor Chief Operating
Business Continuity Management Policy
Governance 1 Purpose The purpose of this policy is to communicate Business Continuity Management (BCM) framework, responsibilities and guiding principles for Victoria to effectively prepare for and achieve
How To Manage Safety Risk In Aviation
4 AVIATION RISK MANAGEMENT AN INTRODUCTION Civil AVIATION AuthORITy of New Zealand BOOKLET FOUR PUBLISHED: JUNE 2013 Preface The Civil Aviation Authority (CAA) published Advisory Circular AC00-4 Safety
CORP 600 00 RISK MANAGEMENT POLICY & METHODOLOGY
CORP 600 00 RISK MANAGEMENT POLICY & METHODOLOGY CORP 600 RISK MANAGEMENT POLICY Purpose In March 2003, the Australian Stock Exchange (ASX) Corporate Governance Council released the first version of its
Project Zeus. Risk Management Plan
Project Zeus Risk Management Plan 1 Baselined: 5/7/1998 Last Modified: N/A Owner: David Jones/Zeus Project Manager Page Section 1. Introduction 3 1.1 Assumptions, Constraints, and Policies 3 1.2 Related
Motivations. spm - 2014 adolfo villafiorita - introduction to software project management
Risk Management Motivations When we looked at project selection we just took into account financial data In the scope management document we emphasized the importance of making our goals achievable, i.e.
INTEGRATED PLANNING AND REPORTING
Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword
DPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010
DPC - Strategy and Project Delivery Unit Project Management Methodology Updated April 2010 This project management methodology is designed to help SPDU staff to plan, manage and measure a successful project
Risk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
RISK MANAGEMENT TOOLKIT
RISK MANAGEMENT TOOLKIT (OPERATIONAL) This toolkit has been adapted from the toolkit prepared by the Finance Facilities and Planning Services Branch of the Department of Education and the University of
TEC Capital Asset Management Standard January 2011
TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining
Incident Standard Service Request Information Request. IT Request. Minor/Low Impact Change to Existing Service. Capture and refine the idea
Incident Standard Service Request Information Request IT Request Idea Capture and refine the idea Determine the type of work Minor/Low Impact to Existing Service Mgmt. Work with customer, management to
Information Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
Risk Management Policy
Risk Management Policy Responsible Officer Author Ben Bennett, Business Planning & Resources Director Julian Lewis, Governance Manager Date effective from December 2008 Date last amended December 2012
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
TRANSPORT FOR LONDON AUDIT COMMITTEE STRATEGIC RISK MANAGEMENT PROGRESS REPORT
AGENDA ITEM 4 TRANSPORT FOR LONDON AUDIT COMMITTEE SUBJECT: STRATEGIC RISK MANAGEMENT PROGRESS REPORT DATE: 3 MARCH 2009 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this paper is to update the Audit
Risk Management Policy Adopted by:
Risk Management Policy Adopted by: Infigen Energy Limited Infigen Energy (Bermuda) Limited Infigen Energy RE Limited in its capacity as Responsible Entity of Infigen Energy Trust Adopted: 17 December 2009
Department of Treasury & Finance. Victorian Government Risk Management Framework
Victorian Government Risk Management Framework July 2007 Table of contents Table of contents... i Foreword... 1 1 Overview... 2 2 Introduction... 3 3 Purpose... 3 4 Coverage and application... 4 5 Adoption
Outcome Realisation and Organisational Change Management. the Tasmanian Government Approach
Slide 1 Outcome Realisation and Organisational Change Management the Tasmanian Government Approach Carol Bond, Senior Project Officer Inter Agency Policy and Projects Unit Slide 2 The Tasmanian Government
LEVEL 5. Advanced Diploma in Purchasing and Supply. Senior Assessor s Report. July 2012. Risk Management and Supply Chain Vulnerability L5-02
LEVEL 5 Advanced Diploma in Purchasing and Supply Risk Management and Supply Chain Vulnerability L5-02 Senior Assessor s Report July 2012 L5-02 Senior Assessor Report July 2012 FV 1/8 SECTION A Candidates
Risk Management in the HSE; An Information Handbook
Risk Management in the HSE; An Information Handbook Document reference number Revision number OQR011 Revision date October 2011 Review date Document developed by 5 Document approved by October 2013 Responsibility
Business Continuity Management
Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not
Before starting it is worth considering what we mean by the term project - basically it can be defined as:
Delivering Successful Projects, Tom Moriarty, MDR Consulting This paper outlines the critical requirements of success in managing projects of all types from the definition of a business need to the delivery
CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE
CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE TABLE OF CONTENTS STEP 1 IDENTIFY THE CHANGE... 5 1.1 TYPE OF CHANGE... 5 1.2 REASON FOR THE CHANGE... 5 1.3 SCOPE THE CHANGE... 6 1.4 WHERE ARE YOU NOW?...
Risk Management Policy and Process Guide
Risk Management Policy and Process Guide Status: pending Next review date: December 2015 Page 1 Information Reader Box Directorate Medical Nursing Patients & Information Commissioning Operations (including
Risk Management Strategy 2012-2014
Management Strategy 2012-2014 Mission: To support and develop a sustainable, thriving and resilient community through leadership and partnerships NOTE: This Document should be read in conjunction with
Negative Risk. Risk Can Be Positive. The Importance of Project Risk Management
The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project and in the best interests t of
Australian Accounting Standards Board (AASB)
Standards Board () FACT SHEET September 2011 1038 Life Insurance Contracts (This fact sheet is based on the standard as at 1 January 2011.) Important note: This standard is an Australian specific standard
POLICY 001: DAILY TRAINING ENVIRONMENT
POLICY 001: DAILY TRAINING ENVIRONMENT FOR PREMIER AND RESERVES TEAMS Document Title Author/Document Reviewer: Approved: 27/08/2014 File name: Version No. Version 2 Review Date. August 2016 Document and
PROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
Risk Workshop Overview. MOX Safety Fuels the Future
Risk Workshop Overview RISK MANAGEMENT PROGRAM SUMMARY CONTENTS: Control Account Element Definition ESUA Form Basis of Estimate Uncertainty Calculation Management Reserve 1. Overview 2. ESUA Qualification
RISK MANAGEMENT STRATEGY
RISK MANAGEMENT STRATEGY 1 Introduction The purpose of this document is to outline a which facilitates the effective recognition and management of risks facing the University. The Combined Code on Corporate
HealthConnect Tasmania Program Plan 2006-07
HealthConnect Tasmania Program Plan 2006-07 Department of Health and Ageing Department of Health and Human Services Version 1.a (September 2006) Acknowledgements The HealthConnect Program Management methodology
Policy and Procedure Statement
Policy and Procedure Statement SUBJECT: Enterprise Risk CATEGORY: General Administration NO. 502-G PREAMBLE Risk exists in all activities and cannot be avoided, nor can it always be eliminated. However,
Council Meeting Agenda 27/07/15
3 Risk Management Framework Abstract Council s Risk Management Framework ( the Framework ) was adopted by Council in 2012. The Framework provides structure and guidance to Council s risk management activities
Internal Audit Report Project Management
Audit Committee, 20 Internal Audit Report Project Management Executive summary and recommendations Introduction As part of the Internal Audit Plan for 2013-14 Mazars have undertaken a review of arrangements