How successfully are you delivering change? - 1 -

Size: px
Start display at page:

Download "How successfully are you delivering change? - 1 -"

Transcription

1 How successfully are you delivering change? - 1 -

2 Introducing the Roadmap for Transformational Change (RTC) The challenge Successfully delivering change that makes a real difference to value and productivity requires radical thinking about new ways to design and deliver services. It requires an approach that recognises and deals with complexity, constraints and conflict. It needs leaders with a clear, compelling and shared vision, a drive to realise benefits and a renewed focus on transformational change. What is transformational change? Transformational change is radical in nature, it is also difficult to achieve It requires a shift in assumptions made by the organisation and its members. Transformation can result in an organisation that differs significantly in terms of structure, processes, culture and strategy. (NHS SDO publication of May 2001). ISIP s core proposition is that integrated service improvement drives transformational change. How does the ISIP RTC help? ISIP s Roadmap for Transformational Change (RTC) provides a framework to support people who are leading and managing integrated service improvement as a way to achieve effective and successful transformational change

3 delivering successful change - 3 -

4 What is the RTC? A framework for change The RTC is a framework that enables health and social care organisations to design, plan and deliver integrated and transformational change that is both successful and sustainable. The primary purpose of the RTC is to stimulate and guide local decisions. It is NOT a prescriptive method, nor is it mandatory: however, because of its focus on transformational change and the use of systematic techniques, it requires active support from chief executives and senior clinical leaders. For commissioners and providers The RTC is relevant to both commissioners and providers and can be used across a Local Health / Social Care Community (LHC/LHSCC), a clinical network and an individual trust or organisation. Based on recognised good practice The RTC is based on recognised good practice, research and experience including, for example, the Office of Government Commerce (OGC) approach to Managing Successful Programmes (MSP) and Cranfield University s approach to Benefits Management

5 Phases, Strands and Activity Maps The ISIP RTC describes a journey through five phases starting with LHC-wide strategic planning and ending with the implementation of change and the realisation of benefits. Each phase is supported by an Activity Map that identifies a balanced and interconnected set of activities across four strands. The activities provide access to additional guidance, tools and techniques. As change programmes are implemented, the RTC will be populated with further content including case studies and will eventually become a key source of knowledge for integrated and transformational change in health and social care

6 Phases: Describing the journey of change The RTC is set out as an iterative journey through five phases: however, change leaders and change agents can choose to start at any phase and should be guided in doing so by their priorities and by what it is feasible for them to achieve. If, for example, an organisation, network or community starts by using the RTC to improve the way they specify and plan projects, and to ensure these are focused on the realisation of benefits, they may want later to consider both the integrated change programmes to which their projects (should) contribute and the strategy that sets the direction for change. Where phases are used in sequence, each phase will: validate and use output from the previous phase build ownership and sponsorship and secure commitment to move to the next phase. Phase I Initiation and strategic planning Phase II High-level design and benefits planning Phase III Detailed analysis and design Phase IV Developing, testing and training Phase V Implementing, tracking and improving - 6 -

7 Strands: Ensuring focus and balance The purpose of the four strands is to ensure that, as the focus of activity changes through the five phases, an essential balance is maintained between the key aspects of the integrated and transformational change that is being designed, planned and delivered. Governance & Management Strategy & Benefits ensuring decision-making and control maintaining a focus on benefits realisation People, Process & Technology Change Stakeholder Engagement & Communication designing and delivering all aspects of change ensuring stakeholder participation and commitment - 7 -

8 Activity Maps: Guiding local change Phase V: Implement, Track and Improve (This phase is undertaken separately for each project and co-ordinated across the portfolio of projects within each integrated change programme) Governance & Management Manage project plans Manage programmes Undertake Post Formally close for implementation to ensure continuous Project Review / project / and transition improvement Programme Review programme April 2006 Each phase of the RTC is supported by an Activity Map that identifies a balanced and interconnected set of activities across the four strands. The map for each phase is shown later in this booklet. Strategy & Governance & Benefits Management People, Process Strategy Governance & and Technology & Benefits Management Change Strategy & Benefits Phase III: Detailed Analysis and Design People, Process and Technology Change Stakeholder Engagement & Communication Realise, measure and review benefits (This phase is undertaken separately for each project and co-ordinated across the portfolio of projects within each integrated change programme) Confirm project governance structure Agree objectives for project Undertake final benefits review Set up and deliver support for all aspects of change Reaffirm costs and Maintain PID, Create and approve priorities across all Programme Definition PID (for new projects) Continue programmes to improve within Implement and ISI Plan workflows and the use the ISI Plan Changes of technology, equipment and facilities Continue to update and deliver training Define and plan and education Produce project outcomes, benefits benefits realisation and measures plan Set-up ongoing Celebrate Update feedback new state Create specifications communications plan mechanisms for required technology and equipment Analyse and design Design workforce workflows for projects changes required for including care future state pathways Design and plan required changes to facilities and estates Design and deliver Obtain organisation Update and continue to Complete impact stakeholder management implement assessment transformational skills commitment to communications plans training stretch targets April 2006 A systematic approach to integrated change will require at least the consideration of all of the activities in the relevant phase(s). The sequence of these activities and the extent to which they are followed, should be based on local conditions and requirements and on an assessment of likely costs and benefits. People, Stakeholder Process and Engagement & Technology Communication Change Stakeholder Engagement & Communication Individual activities and the RTC as a whole should be used alongside other complementary approaches, for example those that are recommended by the NHS Institute for Innovation and Improvement

9 Activities: Accessing guidance, tools & techniques Clicking on any area of a phase brings up an activity map Clicking on any activity brings up a page which describes the activity, its triggers, inputs, tasks, outputs and links to supporting material including guidance, case studies, tools & techniques and other sources of useful guidance -9-

10 What can the RTC do for you? Your organisation, network or community can use the RTC to share experience and build a skilled and recognised community of change leaders, including clinicians and managers, to deliver successful transformational change. It provides your change leaders with organised access to guidance, tools, techniques that support: collaborative decision-making and control over a portfolio of integrated change programmes design and implementation of benefits-led integrated change people, process and technology changes through the integration of national enablers the involvement of all stakeholders including patients, service users and staff. ISIP s vision for the RTC is that it will become an evolving source of knowledge used and maintained by enthusiastic change leaders, including clinicians and managers, working with patients and staff to achieve transformational change. ISIP recognises that achieving its vision for the RTC is itself likely to require transformational change. Publishing the RTC in its current form as a proof of concept is the first step in this journey

11 ISIP s vision for the RTC The RTC is an evolving source of knowledge used and maintained by enthusiastic change leaders, including clinicians and managers, working with patients and staff to achieve transformational change. organise & manage RTC is an evolving source of knowledge ISIP Support use own & maintain research & advise Community of change leaders including clinicians and managers Is perceived to be Relevant, useful & proven The agreed way we do things around here Supported by patients, service users and staff Part of all leadership training by

12 Phase I: Initiation and Strategic Planning Purpose: To agree and gain commitment from leaders of all organisations in the LHC on the portfolio of integrated change programmes that contribute to their shared vision for health and social care across the LHC and address the case for change. Key Output: Integrated Service Improvement Plan (ISI Plan) and a comprehensive Communications Plan. Success Criteria: A clear case for collaborative cross-community change and an agreed plan to deliver the change through a portfolio of integrated change programmes which is accepted by the leaders of the LHC, including clinicians

13 - 13 -

14 Phase II: High-level Design and Benefits Planning Purpose: To work with staff and patient representatives to design an integrated change programme that delivers transformational change and realises quality and value benefits. (This phase is carried out for each integrated change programme and co-ordinated across the portfolio of programmes in the ISI Plan.) Key Output: Programme Definition that includes a business case, a description of high-level process changes and a Programme Benefit Realisation Plan (BRP) with high-level estimates of costs and benefits. Success Criteria: A high level design for a benefits-led integrated change programme that clearly articulates the current state and scopes specific projects that are required to deliver the future state. Agreement from executive teams, including clinicians, of all relevant organisations in the LHC to move forward to detailed design and analysis

15 - 15 -

16 Phase III: Detailed Analysis and Design Purpose: To carry out detailed analysis and design for a project and ensure that each organisation within the LHC understands the implications of implementing the programme. (This phase is carried out for each project and co-ordinated across the portfolio of projects within each integrated change programme.) Key Output: Success Criteria: Detailed specification of all aspects of the design. Project Initiation Documents including, where required, a Project Benefit Realisation Plan. Local managers and clinicians in organisations responsible for delivering the project give their unequivocal commitment (in terms of sponsorship, dedicated resources and funding) to move forward to development, testing and training. A detailed design for a project which integrates relevant changes to workforce, processes, technology, facilities and estates the benefits of which are understood and fully accepted by staff and patient representatives

17 - 17 -

18 Phase IV: Develop, Test and Train Purpose: To develop the changes specified during detailed design and analysis, test these with the people affected by the change and to provide training. (This phase is carried out for each project and co-ordinated across the portfolio of projects within each integrated change programme.) Key Output: Comprehensive training in the new tested workflows; new systems, facilities and associated policies and procedures ready for implementation; confirmed baseline measurements for all benefits; detailed plans for implementation and transition. Success Criteria: All proposed changes have been successfully piloted and staff are confident that they can work in the new environment. Senior management and clinicians declare that they are ready to go ahead with the required changes and to move forward to implementation

19 - 19 -

20 Phase V: Implement, Track and Improve Purpose: To implement all of the changes that have been designed, developed and tested, ensuring that the actions needed to deliver the benefits are completed, the benefits realised are measured and a plan for continuous improvement is agreed. (This phase is carried out for each project and co-ordinated across the portfolio of projects within each integrated change programme.) Key Output: Final Benefits Review and plans for continuous improvement. Success Criteria: New responsibilities, new ways of working and/or new information systems are operational across the LHC and employees fully trained. Patients, service users and staff are realising measured benefits and are keen to celebrate and share the success of the change

21 - 21 -

22 What now, what next? The RTC can be accessed through the ISIP website:. Encourage change leaders, including clinicians and managers, within your organisation to visit the website, use the RTC and provide us with feedback. Our aim is to ensure that the RTC becomes the framework that you need to deliver successful transformational change. We are particularly looking for: evidence of your success in delivering transformational change to inform and populate the RTC your help to identify change leaders from within your organisation for whom the RTC could become a valuable resource. You can contact us via on [email protected] or by calling Alternatively you can find out more via your SHA ISIP Lead (details of your local contact can be found on our website at )

23 Are you ready to deliver successful transformational change? Does your LHC have a shared vision for health and social care? Is your LHC designing benefits-led change that exploits national enablers? Is your LHC managing change so that patients and staff fully appreciate its value? Is there clarity, co-ordination and control across all change taking place within your LHC? Does your LHC have leaders who are committed to delivering transformational change? Is your LHC using the right processes, tools and skills to deliver transformational change? The ISIP Roadmap for Transformational Change helping Local Health Communities deliver successful change

24 NHS Integrated Service Improvement Programme 7 th Floor New Kings Beam House 22 Upper Ground London SE1 9BW Further information website: [email protected] tel: Version 3 released November 2006 Crown Copyright 2006 Working in partnership with the Department of Health, the Office of Government Commerce and the NHS Institute for Innovation and Improvement

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

Confident in our Future, Risk Management Policy Statement and Strategy

Confident in our Future, Risk Management Policy Statement and Strategy Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents

More information

MANAGING DIGITAL CONTINUITY

MANAGING DIGITAL CONTINUITY MANAGING DIGITAL CONTINUITY Project Name Digital Continuity Project DRAFT FOR CONSULTATION Date: November 2009 Page 1 of 56 Contents Introduction... 4 What is this Guidance about?... 4 Who is this guidance

More information

Lessons learned from creating a change management framework

Lessons learned from creating a change management framework Lessons learned from creating a change management framework Author Melanie Franklin Director Agile Change Management Limited Contents Introduction 3 What is a Change Management Framework? 3 Why is it called

More information

The South Staffordshire and Shropshire Health Care NHS Foundation Trust Digital Strategy 2014 2019

The South Staffordshire and Shropshire Health Care NHS Foundation Trust Digital Strategy 2014 2019 The South Staffordshire and Shropshire Health Care NHS Foundation Trust Digital Strategy 2014 2019 Peter Kendal Associate Director for Information Management and Technology Development 01/12/2014 1 Page

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

Guide for Clinical Audit Leads

Guide for Clinical Audit Leads Guide for Clinical Audit Leads Nancy Dixon and Mary Pearce Healthcare Quality Quest March 2011 Clinical audit tool to promote quality for better health services Contents 1 Introduction 1 1.1 Who this

More information

Informatics: The future. An organisational summary

Informatics: The future. An organisational summary Informatics: The future An organisational summary DH INFORMATION READER BOX Policy HR/Workforce Management Planning/Performance Clinical Document Purpose Commissioner Development Provider Development Improvement

More information

NATIONAL INFORMATION BOARD. WORK STREAM 1.2 ROADMAP Enable me to make the right health and care choices

NATIONAL INFORMATION BOARD. WORK STREAM 1.2 ROADMAP Enable me to make the right health and care choices NATIONAL INFORMATION BOARD Personalised Health and Care 2020 WORK STREAM 1.2 ROADMAP Enable me to make the right health and care choices Providing citizens with access to an assessed set of NHS and social

More information

Delivering Quality in Primary Care National Action Plan. implementing the Healthcare Quality Strategy for NHSScotland

Delivering Quality in Primary Care National Action Plan. implementing the Healthcare Quality Strategy for NHSScotland Delivering Quality in Primary Care National Action Plan implementing the Healthcare Quality Strategy for NHSScotland Delivering Quality in Primary Care National Action Plan implementing the Healthcare

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

A framework of operating principles for managing invited reviews within healthcare

A framework of operating principles for managing invited reviews within healthcare A framework of operating principles for managing invited reviews within healthcare January 2016 Background 03 Introduction 04 01 Purpose 05 02 Responsibility 06 03 Scope 07 04 Indemnity 08 05 Advisory

More information

High Quality Care for All Measuring for Quality Improvement: the approach

High Quality Care for All Measuring for Quality Improvement: the approach High Quality Care for All Measuring for Quality Improvement: the approach Our vision 1. Improving quality has always been a central motivation for all who work in the NHS. High Quality Care for All, the

More information

Workforce capacity planning model

Workforce capacity planning model Workforce capacity planning model September 2014 Developed in partnership with 1 Workforce capacity planning helps employers to work out whether or not they have the right mix and numbers of workers with

More information

Message from the Chief Executive of the RCM

Message from the Chief Executive of the RCM Message from the Chief Executive of the RCM The Midwifery Leadership Competency Framework has been derived from both the NHS Leadership Qualities Framework and the Clinical Leadership Competency Framework.

More information

the Defence Leadership framework

the Defence Leadership framework the Defence Leadership framework Growing Leaders at all Levels Professionalism Loyalty Integrity Courage Innovation Teamwork Foreword One of the founding elements of Building Force 2030, as outlined in

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

There is strong Government. Uganda: performance contracting, budget reporting and budget monitoring SUMMARY

There is strong Government. Uganda: performance contracting, budget reporting and budget monitoring SUMMARY COUNTRY LEARNING NOTES Uganda: performance contracting, budget reporting and budget monitoring Margaret Kakande & Natasha Sharma * July 2012 SUMMARY The Government of Uganda has introduced performance

More information

Gateway review guidebook. for project owners and review teams

Gateway review guidebook. for project owners and review teams Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

Request for feedback on the revised Code of Governance for NHS Foundation Trusts

Request for feedback on the revised Code of Governance for NHS Foundation Trusts Request for feedback on the revised Code of Governance for NHS Foundation Trusts Introduction 8 November 2013 One of Monitor s key objectives is to make sure that public providers are well led. To this

More information

The importance of nurse leadership in securing quality, safety and patient experience in CCGs

The importance of nurse leadership in securing quality, safety and patient experience in CCGs Briefing note: July 2012 The importance of nurse leadership in securing quality, safety and patient experience in CCGs Introduction For the NHS to meet the challenges ahead, decisions about health services

More information

National Standards for Headteachers

National Standards for Headteachers Guidance Organisation & Management National Standards for Headteachers Staff Management Status: Information Date of issue: 10/2004 Ref: DfES/0083/2004 Contents Introduction 2 Shaping the Future 6 Leading

More information

IPL Service Definition - Project Management, Programme Management and Governance

IPL Service Definition - Project Management, Programme Management and Governance IPL Proposal IPL Service Definition - Project Management, Programme Management and Governance Project: Date: 16th Dec 2014 Issue Number: Issue 1 Customer: Crown Commercial Service Page 1 of 8 IPL Information

More information

Communication and Engagement Strategy 2014 2017. Final Version 30 th June 2014

Communication and Engagement Strategy 2014 2017. Final Version 30 th June 2014 Communication and Engagement Strategy 2014 2017 Final Version 30 th June 2014 Contents Introduction 4 Strategic Objectives and Role of Communications 6 Communications now and by 2017 7 Communications and

More information

CAPABILITY MATURITY MODEL & ASSESSMENT

CAPABILITY MATURITY MODEL & ASSESSMENT ENTERPRISE DATA GOVERNANCE CAPABILITY MATURITY MODEL & ASSESSMENT www.datalynx.com.au Data Governance Data governance is a key mechanism for establishing control of corporate data assets and enhancing

More information

IT Project Management

IT Project Management IT Project Management IT Project Management provides a structured approach to making things happen and in doing so, enables initiatives (projects) to be delivered to time, quality and budget. www.business.wales.gov.uk/superfastbusinesswales

More information

This iterative list of questions is designed to form an initial diagnostic questionnaire to assess a bank s current

This iterative list of questions is designed to form an initial diagnostic questionnaire to assess a bank s current AUGUST 2015 PROJECT TECHNICAL NOTE DIAGNOSTIC CHECKLIST FOR SME BENCHMARKING INTRODUCTION Key Questions Undertaking an Initial Benchmarking Review of SME Banking Practice This iterative list of questions

More information

Project, Programme and Portfolio Management Delivery Plan 6

Project, Programme and Portfolio Management Delivery Plan 6 Report title Agenda item Project, Programme and Portfolio Management Delivery Plan 6 Meeting Performance Management and Community Safety Panel 27 April 2009 Date Report by Document number Head of Strategy

More information

Information and technology for better care. Health and Social Care Information Centre Strategy 2015 2020

Information and technology for better care. Health and Social Care Information Centre Strategy 2015 2020 Information and technology for better care Health and Social Care Information Centre Strategy 2015 2020 Information and technology for better care Information and technology for better care Health and

More information

How to Make RAM Part of the Business Process

How to Make RAM Part of the Business Process How to Make RAM Part of the Business Process 14th Transport Sector Coordinating Committee (TSCC) Meeting of the Central Asia Regional Economic Cooperation Program 27-30 April 2015 Ulaanbaatar, Mongolia

More information

Benefits Realization from IS & IT, and Change Management of roles and the working practices of individuals and teams.

Benefits Realization from IS & IT, and Change Management of roles and the working practices of individuals and teams. : Delivering Value from IS & IT Investments John Ward and Elizabeth Daniel John Wiley & Son Ltd ISBN: 9780470094631, 399 pages Theme of the Book This book explores a process and practical tools and frameworks

More information

NHS Innovator Accelerator. Guidance note - for completing the application form

NHS Innovator Accelerator. Guidance note - for completing the application form NHS Innovator Accelerator Guidance note - for completing the application form Guidance note - for completing the application form Please read the Call for Applications before completing the application

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Good Practice Framework. Performance Management

Good Practice Framework. Performance Management Good Practice Framework Performance Management Decision Gatewa y Good Practice Framework Strategic Planning STRATEGIC PLANNING Policy Context Needs Assessment Strategic Review Outcomes Continuous Improvement

More information

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE DEVELOPMENT ASSISTANCE COMMITTEE PARIS, 1991 DAC Principles for Evaluation of Development Assistance Development Assistance Committee Abstract: The following

More information

Programme Governance and Management Plan Version 2

Programme Governance and Management Plan Version 2 PROCESS FOR CHANGE - Detailed Design Programme Governance and Management Plan Version 2 1 INTRODUCTION In October 2008, the Council approved the selection of seven opportunity themes to take forward from

More information

NATIONAL QUALITY BOARD. Human Factors in Healthcare. A paper from the NQB Human Factors Subgroup

NATIONAL QUALITY BOARD. Human Factors in Healthcare. A paper from the NQB Human Factors Subgroup NQB(13)(04)(02) NATIONAL QUALITY BOARD Human Factors in Healthcare A paper from the NQB Human Factors Subgroup Purpose 1. To provide the NQB with a near final version of the Concordat on Human Factors

More information

Our five-year strategy 2015-19

Our five-year strategy 2015-19 Draft summary for comment Draft summary for comment Draft summary for comment Draft summary for comment Draft summary for comment Draft summary Our five-year strategy 2015-19 Introduction Foreword from

More information

Case Study. Driving culture change to achieve WCM status. What LEAP participants are saying about: Leadership. Engagement. Alignment.

Case Study. Driving culture change to achieve WCM status. What LEAP participants are saying about: Leadership. Engagement. Alignment. An Case Study Driving culture change to achieve WCM status Read how helped a manufacturing facility in The Netherlands to: Create distributed leadership, improving the effectiveness of decisionmaking and

More information

Principles and expectations for good adult rehabilitation. Rehabilitation is everyone s business: Rehabilitation Reablement Recovery

Principles and expectations for good adult rehabilitation. Rehabilitation is everyone s business: Rehabilitation Reablement Recovery Wessex Strategic Clinical Networks Rehabilitation Reablement Recovery Rehabilitation is everyone s business: Principles and expectations for good adult rehabilitation 2 Principles and expectations for

More information

Provider considerations for delivering an outcome based contract. Croydon CCG and London Borough of Croydon

Provider considerations for delivering an outcome based contract. Croydon CCG and London Borough of Croydon Provider considerations for delivering an outcome based contract Croydon CCG and London Borough of Croydon Contents Introduction and Background Introduction 4 Commissioning for Outcomes: Aims and Benefits

More information

Effectively Managing Change in Your IT Modernization Effort

Effectively Managing Change in Your IT Modernization Effort Leveraging People, Processes, and Technology Effectively Managing Change in Your IT Modernization Effort A White Paper 7500 Old Georgetown Road, 11th Floor Bethesda, MD 20814-6198 Tel: 240-482-2100 Fax:

More information

Benefits. MIRACLE Benefits. I have no idea! What is going on in here? Konferencja "Bezpieczny Projekt" WARSZAWA 11 maja 2010 r.

Benefits. MIRACLE Benefits. I have no idea! What is going on in here? Konferencja Bezpieczny Projekt WARSZAWA 11 maja 2010 r. Programme Plan MIRACLE Benefits Benefits What is going on in here? I have no idea! 1 W A R S Z A W A R Z E S Z Ó W W R O C Ł A W 1 Fitting the pieces together How the APMG Product Set helps you manage

More information

Data Governance: We Know We Want It, But What Is It?

Data Governance: We Know We Want It, But What Is It? Steve Hawtin, Schlumberger Data Governance is becoming one of the most frequently discussed topics in the data handling world, and this is, of course, good news. So much evidence has been published about

More information

Project Management. What is Project Management?

Project Management. What is Project Management? Project Management Project Management enables your business to proceed with new initiatives in a way that allows: Costs to be controlled Agreed outcomes to be measured and confirmed Timescales to be met

More information

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant

More information

Emerging Leaders Programme 2011 Personal Leadership Development Plan and Portfolio

Emerging Leaders Programme 2011 Personal Leadership Development Plan and Portfolio Emerging Leaders Programme 2011 Personal Leadership Development Plan and Portfolio Emerging Leaders Programme 2011 Personal Leadership Development Plan and Portfolio Name 2 Personal Leadership Development

More information

PUBLIC HEALTH LIMITED OPEN CALL SCHEME (LOCS) PHA202 RESEARCH BRIEFING

PUBLIC HEALTH LIMITED OPEN CALL SCHEME (LOCS) PHA202 RESEARCH BRIEFING Introduction PUBLIC HEALTH LIMITED OPEN CALL SCHEME (LOCS) PHA202 RESEARCH BRIEFING Following publication of its new national health research strategy Best Research for Best Health (DH 2006a), the Department

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

P3M3 Portfolio Management Self-Assessment

P3M3 Portfolio Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction

More information

Leadership milestone matrix

Leadership milestone matrix New Deal for the Education Workforce Leadership milestone matrix Leading, learning, inspiring Audience All educational practitioners working with learners from ages 3 to 19 including teachers, leaders

More information

RISK MANAGEMENT STRATEGY 2014-17

RISK MANAGEMENT STRATEGY 2014-17 RISK MANAGEMENT STRATEGY 2014-17 DOCUMENT NO: Lead author/initiator(s): Contact email address: Developed by: Approved by: DN128 Head of Quality Performance [email protected] Quality Performance Team

More information

Cope Foundation - Policy & Review

Cope Foundation - Policy & Review STAFF TRAINING & DEVELOPMENT POLICY Document Control Authorised by: Colette Kelleher, Chief Executive Date: May 2014 Review Date: May 2017 Document Review History Previous Document: - Amended (Y/N): -

More information

Appendix A: ICT and Information Management Strategy

Appendix A: ICT and Information Management Strategy Appendix A: ICT and Information Management 2014 2019 Head of Information and Business Change Sarah Caulkin October 2014 1 Version Control: Date Version Author Comments 04/08/14 0.1 Jo Harley First draft

More information

Risk Management. National Occupational Standards February 2014

Risk Management. National Occupational Standards February 2014 Risk Management National Occupational Standards February 2014 Skills CFA 6 Graphite Square, Vauxhall Walk, London, SE11 5EE T: 0207 0919620 F: 0207 0917340 E: [email protected] www.skillscfa.org Skills

More information

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles 1. What is PRINCE2? Projects In a Controlled Environment Structured project management method Generic based on proven principles Isolates the management from the specialist 2 1.1. What is a Project? Change

More information

Transport for London. Projects and Planning Panel

Transport for London. Projects and Planning Panel Agenda Item 4 Transport for London Projects and Planning Panel Subject: TfL Pathway Date: 8 May 2013 1 Purpose 1.1 At its meeting of 8 January 2013 the Panel asked for further information about Pathway,

More information

Exercise therapy and the treatment of mild or moderate depression in primary care

Exercise therapy and the treatment of mild or moderate depression in primary care Exercise therapy and the treatment of mild or moderate depression in primary care Up and running? Executive summary Why isn t exercise referral offered by GPs? According to our research, only 42% of GPs

More information

Good governance outcomes for CCGs: A survey tool to support development and improvement of governance

Good governance outcomes for CCGs: A survey tool to support development and improvement of governance Good governance outcomes for CCGs: A survey tool to support development and improvement of governance Good Governance Institute Part of a programme commissioned by NHS England Publications gateway reference

More information

Future Council Programme Evaluation Framework

Future Council Programme Evaluation Framework Future Council Programme Evaluation Framework Overview of the Evaluation Framework for the Future Council Programme DRAFT v0.7 August 2015 Contents 1. Evaluation Framework Overview 2. Evaluation Framework

More information

Date of Trust Board 29 th January 2014. Title of Report Performance Management Strategy - 2013-2016

Date of Trust Board 29 th January 2014. Title of Report Performance Management Strategy - 2013-2016 ENCLOSURE: P Date of Trust Board 29 th January 2014 Title of Report Performance Management Strategy - 2013-2016 Purpose of Report Abstract To set out the Performance Management Strategy of the Trust in

More information

White Paper. PPP Governance

White Paper. PPP Governance PPP Governance The Governance of Projects, Programs and Portfolios (PPP) (sometimes called project governance for convenience) is the sub-set of corporate and organisational governance 1 focused on assisting

More information

National Approach to Information Assurance 2014-2017

National Approach to Information Assurance 2014-2017 Document Name File Name National Approach to Information Assurance 2014-2017 National Approach to Information Assurance v1.doc Author David Critchley, Dave Jamieson Authorisation PIAB and IMBA Signed version

More information

ARCHITECTURE SERVICES. G-CLOUD SERVICE DEFINITION.

ARCHITECTURE SERVICES. G-CLOUD SERVICE DEFINITION. ARCHITECTURE SERVICES. G-CLOUD SERVICE DEFINITION. Table of contents 1 Introduction...3 2 Architecture Services...4 2.1 Enterprise Architecture Services...5 2.2 Solution Architecture Services...6 2.3 Service

More information

GP Systems of Choice (GPSoC)

GP Systems of Choice (GPSoC) GP Systems of Choice (GPSoC) Update October 2006 Contents 1 Introduction 3 2 Scheme status 4 3 Overview of the scheme 5 4 Funding 4.1 IT infrastructure 6 4.2 Annual service charges 6 4.3 Migration 6 5

More information

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide Standard 1 Governance for Safety and Quality in Health Service Organisations Safety and Quality Improvement Guide 1 1 1October 1 2012 ISBN: Print: 978-1-921983-27-6 Electronic: 978-1-921983-28-3 Suggested

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

Financial Conduct Authority. The FCA Data Strategy - How we will manage and use the data we collect

Financial Conduct Authority. The FCA Data Strategy - How we will manage and use the data we collect Financial Conduct Authority The FCA Data Strategy - How we will manage and use the data we collect September 2013 Contents 1. Overview 2 2. Our vision for the future of FCA data 4 3. Our strategy to deliver

More information

Improving oral health and dental outcomes: Developing the dental public health workforce in England. Full Report

Improving oral health and dental outcomes: Developing the dental public health workforce in England. Full Report Improving oral health and dental outcomes: Developing the dental public health workforce in England Full Report DH INFORMATION READER BOX Policy HR/Workforce Management Planning/ Clinical Document purpose

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

How To Be A Successful Health And Social Care Leader

How To Be A Successful Health And Social Care Leader Clinical commissioning group governing body members: Role outlines, attributes and skills October 2012 Clinical commissioning group governing body members: Roles outlines, attributes and skills First published

More information

Strengthening the Performance Framework:

Strengthening the Performance Framework: Strengthening the Performance Framework: Towards a High Performing Australian Public Service Diagnostic Implementation July 2014 2155 This paper was prepared by: Professor Deborah Blackman, University

More information

CREATING A LEAN BUSINESS SYSTEM

CREATING A LEAN BUSINESS SYSTEM CREATING A LEAN BUSINESS SYSTEM This white paper provides an overview of The Lean Business Model how it was developed and how it can be used by enterprises that have decided to embark on a journey to create

More information

Impact and Knowledge Exchange Strategy 2013-2016 Delivering Impact from Research Excellence

Impact and Knowledge Exchange Strategy 2013-2016 Delivering Impact from Research Excellence 1. Background Impact and Knowledge Exchange Strategy 2013-2016 Delivering Impact from Research Excellence Impact is the demonstrable contribution that excellent research (basic, user-inspired and applied)

More information

Integrated Assurance & Approval Strategy and Integrated Assurance & Approval Plans

Integrated Assurance & Approval Strategy and Integrated Assurance & Approval Plans Integrated Assurance & Approval Strategy and Integrated Assurance & Approval Plans A guide to implementing integrated assurance and approvals Version 1.0 - May 2011 Contents Introduction 03 Integrated

More information

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering

More information

People Strategy 2013/17

People Strategy 2013/17 D a t a L a b e l : P U B L I C West Lothian Council People Strategy 2013/17 Contents 1 Overview 2 2 Council Priorities 8 3 Strategy Outcomes 10 1 Engaging and motivating our employees 13 2 Recognised

More information

JOB DESCRIPTION. Chief Nurse

JOB DESCRIPTION. Chief Nurse JOB DESCRIPTION Chief Nurse Post: Band: Division: Department: Responsible to: Responsible for: Chief Nurse Executive Director Trust Services Trust Headquarters Chief Executive Deputy Chief Nurse Head of

More information

Mapping the Technical Dependencies of Information Assets

Mapping the Technical Dependencies of Information Assets Mapping the Technical Dependencies of Information Assets This guidance relates to: Stage 1: Plan for action Stage 2: Define your digital continuity requirements Stage 3: Assess and manage risks to digital

More information

Australian Professional Standard for Principals

Australian Professional Standard for Principals AITSL is funded by the Australian Government Australian Professional Standard for Principals July 2011 Formerly the National Professional Standard for Principals 2011 Education Services Australia as the

More information

How To Reform Social Work

How To Reform Social Work Social Work Reform Briefing from Children England March 2012 About This Briefing This briefing is provided on behalf of the Department for Education s overarching strategic partnership for voluntary, community

More information

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire

More information