Project Finance Structuring: Case Study - Nam Theun 2
|
|
|
- Abel Berry
- 9 years ago
- Views:
Transcription
1 Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad Project History 1970s - Mekong secretariat identified the hydropower potential of the Nam Theun River 1989/91 - World Bank feasibility study undertaken by Snowy Mountains Engineering Corp Government of Lao PDR (GOL) and private sponsors (leader: Transfield) sign an agreement to develop the project GOL asks World Bank to participate to the project financing A first series of environmental and social safeguard documents is produced 1997/98 - Asian crisis: Laos and Thailand agree to delay the project development EGAT and NTPC (leader: EDF) agree on a proposed electricity tariff (May 2000) 1
2 Project History (continued) Shareholders agreement signed between EDFI, EDL, EGCO and ITD (September 2001) NTPC is created as a Lao company (September 2002) Concession agreement signed (October 2002) Joint work between GOL, World Bank and NTPC to finalize safeguards documents Power purchase agreement signed (November 2003) Project financing activities Completion of safeguards documents with the participation of WB, ADB and AFD Financial close (June 2005) and beginning of full construction activities Beginning of commercial operation (December 2009) Schematic Diagram 2
3 Project Details The development, construction, and operation of a 1,070 MW transbasin diversion power plant on the Nam Theun, a tributary of the Mekong. The project site is in the central provinces of Khammuane and Bolikhamxay, about 250 kilometers southeast of Vientiane, and stretches from the top of the annamite mountain chain along the Lao PDR-Viet Nam border, to the Nakai Plateau, and ultimately to the confluence of the lower Xe Bang Fai with the Mekong. It will capture the flow of water from the watershed of the Nam Theun and the Nakai Plateau by building a dam 39 meters (m) high at the northwestern end of the plateau. Project Details (continued) The project will create a reservoir of 450 square kilometers (km2) on the Nakai Plateau. Water from the reservoir will drop about 350 meters to a powerhouse at the base of the Nakai escarpment near the town of Gnommalat. The water discharged from the powerhouse will then flow through a 27 km channel to the Xe Bang Fai, which drains into the Mekong approximately 150 km south of the Nam Theun confluence. A regulating pond will be constructed downstream of the powerhouse to ensure smooth release of water into the downstream water courses. 3
4 Sponsors Franco-Lao-Thai partnership with multilateral support Nam Theun 2 Power Company Limited (NTPC) is a Lao company established in Sept 2002 with the following shareholders: 35% EDF International (EDFI) 25% Electricity Generating Public Company Limited (ECGO) 25% Government of the Lao PDR (GOL) 15% Italian-Thai Development Public Company Limited (ITD) EDF is also acting as head contractor, managing three civil work subcontracts and two electromechanical works subcontracts. Contractual Arrangements Concession agreement signed between GOL and NTPC on 3 October 2002 for a 25 year period following the beginning of commercial operation Power purchase agreements signed on 11 November 2003 for a 25 year operating period between EGAT and NTPC (5,600 GWh per year), between EDL and NTPC (300 GWh per year). 4
5 Contractual Arrangements (continued) Head construction contract between NTPC and EDF- CIH provides for a date certain, fixed-price turnkey contract and comprises five major sub-contracts NTPC will take full responsibility for O&M for the project All environment and social commitments described in the concession agreement: Long term Binding E&S : ~ 10% of total project costs 5
6 Summary of Project Base Cost Estimates ($ million) Item Foreign Exchange Local Currency Total a. Construction cost b. Environmental-social mitigation c. Development cost A d. Financing cost B e. Base contingencies Total base cost ,250.0 Total contingent costs Total , % 37% 100% Project Capital Structure US dollar THB Total % ($ million) ($ million ($ million) equivalent) Equity % Debt % Total , % % 63.6% 36.4% 100.0% 6
7 Financing Plan Exchange Rate Risk Debt and equity are denominated in a mix of dollars (63%) and baht (37%) to match the composition of the two currencies in project base costs. The 50/50 mix of US dollar and baht debt is designed to match the tariff paid by EGAT and EdL. EGAT and EdL will carry exchange rate risk. To the extent the Lao PDR government will receive royalty and taxes in dollars some of the risk will be mitigated. 7
8 million cubic meters Hydrology Risk Historic Flow Records Total Flow capacity Hydrology Risk The annual inflows have varied historically, on average, by approximately 20 percent from the long-term average of 7,526 million m3. This is almost double the capacity of the reservoir, so that in an average year, the reservoir should be fully replenished even after operating the plant at full capacity during the dry season. The minimum water flow recorded was 3,776 million m3 in This was the result of El Nino that brought droughts over much of Southeast Asia. 8
9 Hydrology Risk (continued) The reservoir s probable maximum capacity is 3,910 million m3 amounting to an annual mean energy of 5,700 GWh would have been the only year since 1950 when the flow would not have been sufficient to fill the reservoir from empty. However, as the reservoir will not be fully emptied during operations but will always retain a minimum water level, even in 1998 the reservoir s probable maximum active storage of 3,530 million m3 could have been filled by the water inflows At full supply level (FSL) at an elevation of m, the reservoir would have an area of 450 sq km and would hold 3,910 million cubic meters of water. The powerhouse would have an installed capacity of 1,070 MW. Annual energy generation of 5,462 GWh. 9
10 Energy Component Primary Energy (PE) Secondary Energy 1 (SE1) Secondary Energy 2 (SE2) Quantity GWh/year (1) EGAT Obligation to Purchase 4, % % 282 0% Total 5,636 95% Applicable Tariff 50% in USD, 50% in THB (2) 50% in USD, 50% in THB (2) 100 % THB Fixed over the Term Payment USD and THB respectively 100 % THB (3) 100 % THB Declarations NTPC makes periodic declarations to EGAT. Declarations contain information as to the energy availability which may be provided by NTPC. Declarations serve two main functions: to determine the amount of NTPC s revenues payable by EGAT; and to determine the amount of liquidated damages payable by NTPC to EGAT. Any unavailability reduces the revenues payable by EGAT, whilst any outage results in liquidated damages payable by NTPC 10
11 Dispatch EGAT has the flexibility to dispatch NTPC on a unit by unit basis as it requires, subject only to certain operational constraints. As EGAT is not required to dispatch all of NTPC s declaration, if it dispatches less, dispatch shortfall occurs. As EGAT would have paid NTPC based on all of that declaration, it has the right to make-up subsequently, i.e. the right to dispatch for electrical energy without incurring any additional payment obligation. Dispatch excess: EGAT may dispatch more than all of NTPC s declaration, subject to the limitations to be observed by EGAT in NTPC s declarations Excess Dispatch An excess energy month is: any month in which there is spillage of water from the reservoir; August or September and the water level is above m ASL on the last day of the preceding month; or as elected by NTPC. Increased risk of spillage during an excess energy month. All the dispatch excess energy as determined at the end of an excess energy month shall be accounted as SE2, provided, however, that the outstanding amount of accumulated dispatch shortfall energy is below 200 GWh. 11
12 12
13 Offtake Risk Thailand now has surplus generating capacity, because of the economic downturn in the late 1990s and the large amount of capacity that was then under development and could not be stopped on reasonable terms. On the basis of demand forecast, excluding new plant from end-2003, the capacity surplus will be consumed by By the time of NT2 COD, the project will supply about one-half year of energy demand growth. NT2 would provide about 6 percent of the incremental energy requirement over 2009 to
14 Offtake Risk 14
15 Graph shows comparative economic costs for the most prominent large-scale generation options available to Thailand. A screening curve shows the cost per kwh of a generation plant at a range of capacity utilization rates (or CU rates). While CCGT has a lower investment cost per kw of capacity than does NT2, it has variable operating and fuels costs that NT2 does not have. At CU rates above 30 percent, NT2 is the least-cost alternative for Thailand. 15
16 Liquidity Risk The debt has to be repaid within 15 years - much less than the life of the project. The royalty and tax rates to be applied in each year have been designed specifically for the project on the basis of NTPC s debt repayment schedule. NTPC is exempt from income tax over the period and then pays the following the rates over the remainder of the concession; 5.0% between 2015 and 2021, 15.0% between 2022 and 2027, and 30.0% between 2028 and Liquidity Risk The royalty and tax rates...(continued) The increase in the income tax rate from 5.0% to 15.0% is not implemented until immediately after all NTPC debt is repaid at the end of The royalty is applied at 5.2% between 2009 and 2024, 15.0% between 2025 and 2029, and 30.0% over the remainder of the concession. 16
17 Country Risk Loans are guaranteed by World Bank, ADB Export Credit Agencies Development agencies loans Only THB loan not guaranteed 17
XAYABURI HYDRO POWER PLANT, LAO PDR
XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,
Asian Development Bank Institute. ADBI Working Paper Series
ADBI Working Paper Series Trends in National and Regional Investors Financing Crossborder Infrastructure Projects in Asia Prabir De, Muthi Samudram, and Sanjeev Moholkar No. 245 September 2010 Asian Development
Clean Development Mechanism Project Opportunities in Indonesia
Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002
Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region
Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,
How KASIKORNBANK Plans to Support Green Projects
How KASIKORNBANK Plans to Support Green Projects Clean Power Asia 29-30 April 2013, Bangkok Thongchai Kangvanchai KASIKORNBANK Pcl. 1 Content Government s Policy of Promoting Green Energy KBank s Green
CHAPTER 3 RESEARCH DESIGN
CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.
Daily report. April 26, 2013. BCEL-KT Securities Company Limited Page 1. Market Summary. Turnover by investor type (LAK m)
Lao Securities Exchange Driven by the rise in both listed stocks, LSX moved into the positive territory after two days of stagnation, up by 10.18 points or 0.77 pct to close at 1,340.86 points. Coupled
Pakse Urban Environmental Improvement Project (RRP LAO 43316)
FINANCIAL ANALYSIS 1. Financial viability was assessed for solid waste management (SWM) improvements, which is the project s only revenue-earning subcomponent. 1 A financial sustainability analysis was
Thailand s Commercial Banks Role in Financing Dams in Laos and the Case for Sustainable Banking
Thailand s Commercial Banks Role in Financing Dams in Laos and the Case for Sustainable Banking Carl Middleton, 1 International Rivers 2 December 2009 1 Carl Middleton is Mekong Program Coordinator with
Financing hydropower Introduction to the Specifics of Small Hydro Power Plants
EFSE Annual Meeting 2012, Tiblisi GGF Technical Workshop on Small Hydro Power Financing hydropower Introduction to the Specifics of Small Hydro Power Plants May 2012 01 June 2012 Arnsburger Str. 64, 60385
Integrated Water Resources Management. Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia
Integrated Water Resources Management Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia Coordinated projects financed by 3 French Water Agencies (Loire Brittany,
Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives
Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives Shigeru Yamamura( 山 村 繁 ), Energy Specialist, East Asia Department, Asian Development Bank GMS Power
Clean Energy Project Financing. March 5, 2012
Clean Energy Project Financing March 5, 2012 Disclaimer This presentation is solely for discussion purposes. In preparing this presentation, we, KASIKORNBANK PLC. ( KBank ) have made crucial assumptions
PORT REFORM TOOLKIT WORLD BANK
WORLD BANK FINANCIAL MODEL MANUAL Concession Project in the port sector 1/ PRELIMINARY ADVICE Required Software : Excel 2000 for PC Data & parameters of modelling : It appears in blue colour and exclusively
GMS Economic Cooperation Program
GMS Economic Cooperation Program In 1992, six countries bordering the Mekong River Cambodia, People s Republic of China (specifically, Yunnan province and later, Guangxi Zhuang Autonomous Region), Lao
Options Assessment for Structuring and Financing new Hydropower in PNG
Options Assessment for Structuring and Financing new Hydropower in PNG Issues and Options Report - Revised Judith Plummer November 2011 CONTENTS Summary...3 1 Introduction...4 Purpose of this Paper...4
3.0 OVERVIEW OF LAO POWER SECTOR
3.0 OVERVIEW OF LAO POWER SECTOR 3.1 Setting 3.1.1 Development of the Power Sector In Lao PDR, the power sector serves two vital national priorities: (i) (ii) It provides a reliable and affordable power
Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin
Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin Prepared by the Mekong River Commission under the Basin Development Plan 1 Basin Development Plan 1. Regional planning
Quarterly Report. For the three month period ended. April 30, 2015
Quarterly Report For the three month period ended April 30, 2015 The attached unaudited interim condensed consolidated financial statements have been prepared by Management of International Datacasting
Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2
The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,
China s Small Hydropower in Rural Energy Development
China s Small Hydropower in Rural Energy Development Li Zhiwu National Research Institute for Rural Electrification, China Hangzhou regional (Asia & Pacific) Center for Small Hydropower 2012.8.1 As one
HeveaBoard Berhad (Company No. 275512-A) (Incorporated in Malaysia)
NOTES TO THE FINANCIAL STATEMENTS FOR THE PERIOD ENDED 30 JUNE 2009 A. DISCLOSURE REQUIREMENTS AS PER FINANCIAL REPORTING STANDARDS ( FRS ) 134 (FORMERLY KNOWN AS MALAYSIAN ACCOUNTING STANDARDS BOARD (
The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency
Technical Assistance Report Project Number: 40137 December 2006 The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency The views expressed herein
TAX ISSUES RAISED BY LNG PROJECTS
TAX ISSUES RAISED BY LNG PROJECTS Jon Lobb Baker Botts L.L.P. ABSTRACT This paper discusses tax issues that may be encountered by a company investing in an LNG project. 1. Income Taxes A seller's income
Asian Journal on Energy and Environment
As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable
FINANCIAL AND OPERATING HIGHLIGHTS
Orca Exploration Group Inc. PO Box 3152 Road Town Tortola British Virgin Islands FOR IMMEDIATE RELEASE 30 April 2007 Orca Exploration (formerly EastCoast Energy Corporation) announces its results for the
Integrated Water and Sediment Management of Yellow River
Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic
Hydropower in Myanmar: Moving Electricity Contracts from Colonial to Commercial
79 John F. Kennedy Street, Box 74 Cambridge, Massachusetts 02138 617-495-1134 www.ash.harvard.edu/myanmar Hydropower in Myanmar: Moving Electricity Contracts from Colonial to Commercial Prepared for Proximity
Week 8: Raising and managing working capital
Managing Finance (MNGFIN) Week 8: Raising and managing working capital Raising capital There is no textbook reading for this topic. Pay special attention to the additional Web-based materials and journal
Case Study More Money Please
Case Study More Money Please Question Appeared in: ModelOff 2015 Round 2 Time allocated: 35 minutes INTRODUCTION You work for a Project Company that has an existing senior debt facility which is due to
ASIAN DEVELOPMENT BANK PPA: LAO 22065
ASIAN DEVELOPMENT BANK PPA: LAO 22065 PROJECT PERFORMANCE AUDIT REPORT ON THE NAM NGUM-LUANG PRABANG POWER TRANSMISSION PROJECT (Loans 928-LAO[SF]/1308-LAO[SF]) IN THE LAO PEOPLE S DEMOCRATIC REPUBLIC
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter
PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT
Investment Office ANRS PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT Development Studies Associates (DSA) October 2008 Addis Ababa Table of Contents 1. Executive Summary...1
(1.1) (7.3) $250m 6.05% US$ Guaranteed notes 2014 (164.5) Bank and other loans. (0.9) (1.2) Interest accrual
17 Financial assets Available for sale financial assets include 111.1m (2013: 83.0m) UK government bonds. This investment forms part of the deficit-funding plan agreed with the trustee of one of the principal
FOREIGN DIRECT INVESTMENT IN CAMBODIA
FOREIGN DIRECT INVESTMENT IN CAMBODIA PHNOM PENH SECURITIES PLC. No. 32, Monivong Bld, Phnom Penh, Cambodia Tel: +855-23-426-999 Fax: +855-23-426-495 Website: http://www.pps.com.kh In this Paper: Executive
Financial Performance and Financial Statement Projections
Financial Performance and Financial Statement Projections A. Introduction and Approach 1. The Georgian State Electrosystem (GSE), EA of the project, is a 100% state owned Limited Liability Company responsible
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Uzbekistan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector underpins Uzbekistan s sustained
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
FINANCIAL STATEMENTS. Alberta Beverage Container Recycling Corporation. Contents
1 FINANCIAL STATEMENTS Alberta Beverage Container Recycling Corporation Contents 2 Independent Auditor s Report 3 Statement of Operations and Changes in Net Assets 4 Statement of Financial Position 5 Statement
Examples of Good Practice
Examples of Good Practice Cost Estimates and Financing Plans February 2015 Financial Management Unit Operations Services and Financial Management Department 1 TABLE OF CONTENTS 1 Introduction... 3 2 Investment
6. Gross Domestic Product by Country
6. Gross Domestic Product by Country The economies of the six countries studied for this report have flourished, allowing for the very high growth rates in research and development (R&D) investment and
RISK FACTORS AND RISK MANAGEMENT
Bangkok Bank Public Company Limited 044 RISK FACTORS AND RISK MANAGEMENT Bangkok Bank recognizes that effective risk management is fundamental to good banking practice. Accordingly, the Bank has established
Xayaburi Dam: Timeline of Events (Last updated: July 2013)
Xayaburi Dam: Timeline of Events (Last updated: July 2013) 4 May 2007 Lao government signed memorandum of understanding with Thai company Ch. Karnchang to develop the Xayaburi Dam. 25-27 Sept. 2008 MRC
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
NEWS RELEASE. Avcorp announces 2014 Third Quarter Financial Results. November 13, 2014
Avcorp announces 2014 Third Quarter Financial Results Avcorp Industries Inc. 10025 River Way Delta, British Columbia Canada V4G 1M7 (604) 582 1137 (604) 582 2620 Fax [email protected] Common Stock Listed
Khan Resources Inc. Interim Consolidated Balance Sheets (Expressed in United States dollars) (All dollar amounts are in thousands) (Unaudited)
Interim Consolidated Balance Sheets (All dollar amounts are in thousands) March 31, September 30, 2008 2007 Assets Current Cash $ 32,105 $ 33,859 Accounts receivable 52 47 Prepaid expenses and other assets
Agreements, bonds and guarantees
Agreements, bonds and guarantees SPV Formation The Special Project Vehicle (SPV) may take a variety of forms, including a corporation, limited liability company, general partnership, limited partnership,
LAFE CORPORATION LIMITED Un-audited Q1 2014 Financial Statement and Dividend Announcement (All in US Dollars)
LAFE CORPORATION LIMITED Un-audited Q1 2014 Financial Statement and Dividend Announcement (All in US Dollars) PART I INFORMATION REQUIRED FOR ANNOUNCEMENTS OF QUARTERLY (Q1, Q2 & Q3), HALF-YEAR AND FULL
CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 (Unaudited) TSX-V: ANF. www.anfieldnickel.com
CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 () TSX-V: ANF www.anfieldnickel.com NOTICE OF NO AUDITOR REVIEW The unaudited condensed consolidated interim financial statements,
FINANCIAL PERFORMANCE AND PROJECTIONS
Samarkand Solar Power Project (RRP UZB 45120) FINANCIAL PERFORMANCE AND PROJECTIONS A. Introduction 1. An analysis of the historical financial performance and financial statements projection of the State
Condensed Interim Consolidated Financial Statements
Condensed Interim Consolidated Financial Statements Unaudited (Expressed in Canadian dollars) NOTICE TO READER: These condensed interim consolidated financial statements have not been reviewed by the Company's
How To Get Power From Bhutan To India
Status of Bhutan cross border interconnection with India & Expected Benefits Presentation by Bhutanese team in SARI/EI workshop on competitive electricity markets design, implementation & benefits 18-20
DAWEI Sea PROJECT Port Project DAWEI AND THE REGION
February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW
Kyrgyzstan: Power Generation & Transmission
Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...
DKSH Company Presentation
DKSH Company Presentation TO : OAV - German Asia-Pacific Business Association Delegation Ms. Claire Burgess General Director - Vietnam General Manager Healthcare Vietnam Regional Director Healthcare Indochina
Comparison of Electricity Supply and Tariff Rates in South Asian Countries
Comparison of Electricity Supply and Tariff Rates in South Asian Countries By Faisal Jamil, Energy Specialist (Economics) Introduction A reliable, accessible and affordable supply of energy produced in
THE ORIENTAL HOTEL (THAILAND) PUBLIC COMPANY LIMITED AND ITS SUBSIDIARY COMPANIES REPORT AND CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31
THE ORIENTAL HOTEL (THAILAND) PUBLIC COMPANY LIMITED AND ITS SUBSIDIARY COMPANIES REPORT AND CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2003 AND 2002 Report of Independent Auditor
CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014
CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014 The following management s discussion and analysis ( MD&A ), prepared as of December 11, 2014, should
Northern Blizzard Resources Inc. Condensed Consolidated Interim Financial Statements For the Three Months Ended March 31, 2016 and 2015 (Unaudited)
Northern Blizzard Resources Inc. Condensed Consolidated Interim Financial Statements (Unaudited) CONDENSED CONSOLIDATED INTERIM STATEMENT OF FINANCIAL POSITION In Canadian $000s (unaudited) As at March
eqube Gaming Limited Condensed Interim Consolidated Financial Statements For the Three and Nine Months Ended November 30, 2015 (Unaudited)
Condensed Interim Consolidated Financial Statements For the Three and Nine Months Ended November 30, 2015 Notice to Reader The following interim consolidated financial statements and notes have not been
Public-Private Partnerships
Public-Private Partnerships Closing Critical Issues Washington, Background In limited recourse finance, the primary source of debt service is the cash flow generated by the Project will evaluate all factors
Electricity Business in the Asia-Pacific Region
Electricity Business in the Asia-Pacific Region Business Environment and Challenges (Regional) The opportunities in coming years for CLP to increase its presence in the power industry in the Asia-Pacific
CEMATRIX CORPORATION Consolidated Financial Statements (in Canadian dollars) September 30, 2015
Consolidated Financial Statements September 30, 2015 Management s Responsibility for Financial Reporting and Notice of No Auditor Review of the Interim Consolidated Financial Statements for the Three and
CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS
CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS 122 HANDBOOK FOR THE ECONOMIC ANALYSIS OF WATER SUPPLY PROJECTS CONTENTS 5.1 Introduction...123 5.2 Financial Revenues...124 5.3 Project Costs...126 5.3.1 Investments...127
IMPACT Silver Corp. Interim Consolidated Financial Statements March 31, 2009 Unaudited
Interim Consolidated Financial Statements Statement 1 Consolidated Balance Sheets ASSETS March 31 2009 December 31 2008 Current Cash and cash equivalents $ 5,357,480 $ 5,433,480 Accounts receivable and
Economic Analysis of Small Hydropower Project A Case Study of Lower Khare Small Hydropower Project
Economic Analysis of Small Hydropower Project Ravi Kishor Dutta, Tri Ratna Bajracharya, Shree Raj Shakya Department of Mechanical Engineering, IOE, Central Campus, Pulchowk, Tribhuvan University, Nepal
Nature of operations and basis of preparation (Note 1) Commitments and contingencies (Note 10) Subsequent events (Note 12)
Unaudited Interim Consolidated Financial Statements For the nine months ended September 30, 2005 Contents Interim Consolidated Financial Statements Interim Consolidated Balance Sheets Interim Consolidated
RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES
Page 1 of 8 Section 1. Purpose These Rules and Regulations are adopted by the Board of Governors pursuant to Article 13.3. of the Agreement Establishing the Black Sea Trade and Development Bank (Establishing
CLIMATE CHANGE ADAPTATION ACTIVITIES
CLIMATE CHANGE ADAPTATION ACTIVITIES AND EXPERIENCE IN LAO PDR 5th APN Southeast Asia Sub-Regional Cooperation Meeting, Climate Adaptation Seminar, Proposal Development Training Workshop 22-26 October
ABENGOA YIELD The sustainable total return company
Abengoa Yield announces second quarter 2015 results and a quarterly dividend above guidance Strong results for the period: Further Adjusted EBITDA including unconsolidated affiliates increased by 93% y-o-y
1. Energy. 2. Power. 3. Regional cooperation. 4. Greater Mekong Subregion. I. Asian Development Bank.
September 2012 2012 Asian Development Bank All rights reserved. Published 2012. Printed in the Philippines. ISBN 978-92-9092-836-2 (Print), 978-92-9092-837-9 (PDF) Publication Stock No. RPT124977-2 Cataloging-In-Publication
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows
Contents Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows Paragraphs OBJECTIVE SCOPE 1 3 BENEFITS OF CASH FLOW INFORMATION 4 5 DEFINITIONS 6 9 Cash and cash equivalents 7 9 PRESENTATION OF
Nufarm Finance (NZ) Limited Annual Report For the year ended 31 July 2013
Nufarm Finance (NZ) Limited Annual Report For the year ended 31 July 2013 NUFARM FINANCE (NZ) LIMITED 1 Contents 2 Directors report 3 Company directory 4 Corporate governance 5-6 Auditor s report 7 Statement
Standard Chartered Bank (Thai) PCL & its Financial Business Group Pillar 3 Disclosures 30 June 2015
Standard Chartered Bank (Thai) PCL & its Financial Business Group Registered Office: 90 North Sathorn Road, Silom Bangkok, 10500, Thailand Overview During 2013, the Bank of Thailand ( BOT ) published the
NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand
Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013
ARBN 154 618 989 INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013 CORPORATE DIRECTORY Directors Mr Keith Coughlan Mr Robert Timmins Mr David Porter Mr Colin Ikin Managing Director, CEO
Dhanamitr Factoring Public Company Limited (Formerly: Dhanamitr Factoring Company Limited)
Annual financial statements and Audit report of Certified Public Accountant For the years ended 31 December 2005 and 2004 DHANA MITR FACTORING COMPANY LIMITED Notes to Financial Statements (Continued)
PPPs in Renewable Energy: IFC Advisory Perspective. April 2012
PPPs in Renewable Energy: IFC Advisory Perspective April 2012 IFC s Role Financing IFC is the world s largest multilateral provider of financing for private enterprises with over US$26 billion in outstanding
Income Measurement and Profitability Analysis
PROFITABILITY ANALYSIS The following financial statements for Spencer Company will be used to demonstrate the calculation of the various ratios in profitability analysis. Spencer Company Comparative Balance
-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP )
Information Memorandum of Vintage Engineering Public Limited Company Regarding Related Transaction on the Rendering of Construction Service for The 220MW Solar Power Plant Project located in Minbu, Myanmar
DEBT SUSTAINABILITY ASSESSMENT
Second Green Power Development Project (RRP BHU 44444) DEBT SUSTAINABILITY ASSESSMENT A. Background 1. Objective. The government of Bhutan has followed an investment driven approach for inclusive economic
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
Mitsubishi Electric Announces Consolidated Financial Results for the First 9 Months and Third Quarter of Fiscal 2016
MITSUBISHI ELECTRIC CORPORATION PUBLIC RELATIONS DIVISION 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo, 100-8310 Japan FOR IMMEDIATE RELEASE No. 2989 Investor Relations Inquiries Investor Relations Group
International Accounting Standard 36 Impairment of Assets
International Accounting Standard 36 Impairment of Assets Objective 1 The objective of this Standard is to prescribe the procedures that an entity applies to ensure that its assets are carried at no more
NEPAL ACCOUNTING STANDARDS ON CASH FLOW STATEMENTS
NAS 03 NEPAL ACCOUNTING STANDARDS ON CASH FLOW STATEMENTS CONTENTS Paragraphs OBJECTIVE SCOPE 1-3 BENEFITS OF CASH FLOWS INFORMATION 4-5 DEFINITIONS 6-9 Cash and cash equivalents 7-9 PRESENTATION OF A