Training Programs for Enterprise-Wide Change

Size: px
Start display at page:

Download "Training Programs for Enterprise-Wide Change"

Transcription

1 Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Prepared by VisionCor, Inc. 1

2 Contents Summary... 3 Before We Get Started... 3 Program Principles... 4 Business Partnerships... 5 Resource Planning... 6 Comprehensive Quality Management... 8 Measurement, Measurement, Measurement Additional Considerations Parting Thoughts

3 Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Summary Being the leader of a training team during a large-scale organizational change can be a daunting challenge. The demands for training and change management during a large scale change are almost always more than a company s training team can handle with normal business planning, processes and staffing levels. This paper sets forth Five Requirements that the training team must incorporate into their program to ensure that training significantly contributes to the business success of the change event. Perhaps the largest change events are mergers and acquisitions. Systems, processes, reporting structures, support levels, office locations, benefits and compensation changes are all typical during a merger. It is in this context that the Five Requirements are presented. Of course, there are many other large scale change events including new systems implementations, reorganizations, new product line roll outs, and industry regulation changes that can drive the same demands on the training team. While this paper focuses on change brought about by mergers and acquisitions, these Five Requirements can be universally applied to any large scale change event. The Top Five Requirements for Programs that Deliver are: Defined Program Principles Solid Business Partnerships Effective Resource Planning Comprehensive Quality Management Measurement, Measurement, Measurement Before We Get Started There is a little pre-work to be done before we get to the first of the Five Requirements. Upon learning of the change, your training team should be at the very front end of the planning. A client of mine once said, If you want me [training] to be there at the landing, I need to be there at takeoff. If you are unable to be at the table during the planning phase of the change, you can do some investigating to bring your team up-to-speed. Some questions to launch your investigation might be: Who is experiencing the change and what is changing, at a high level? What is the impact and timing of the change? 3

4 What is the learning culture of the audiences experiencing the change? What are their support needs? What resources are possible for training budget and personnel? Where does the organization want to be before, during, and after the change? Once these questions are answered, you can start to build a framework for the planning and execution of the training program. That framework will be based on the audience, company culture, types of changes, intended outcomes and available resources. It will also be heavily based on lessons learned, either from prior company changes, or from the collective experience of the training team leaders and key stakeholders of the company. Program Principles The program principles are the pillars of the program. They set both the expectations and the boundaries for the training program. They will be used by all stakeholders, including training team members, to make plans and decisions. They will: Articulate the vision for the program in more tactical terms Define the elements of the program you are not willing to compromise Provide a framework for program decisions Enable more effective communication to program stakeholders Form a baseline for expectations An example of a program principle is: Focus on survival skills pre-conversion; deliver in small increments, repeated over time, as close to conversion as possible. This principle may seem fairly obvious. It does, however, tell stakeholders how the training organization will approach implementation planning, and on what basis content decisions will be made during design and development. The principle clearly indicates that if it is not a survival skill, it can wait until after conversion. You may have different principles. They should not change, as that would be similar to moving the footers in a building after the walls are up. You should spend time with every key stakeholder at the start to ensure that they agree to the principles, and agree to support your efforts in line with the principles. Likewise, every training team member should understand them and commit to support them regardless of their role. Some example questions to ask during the formation of the program principles include: What level of proficiency should the target audience team members have after training? Is in-person support, simulation, or facilitated training required to get to that level of proficiency? How should the training be delivered, based on culture and audience needs? 4

5 What is the critical skills filter that should be applied to determine how much content should be delivered, and when? Are there limits to the amount of training for certain roles? Are there scheduling, time-of-year, or time-out- of-the-field considerations when designing the program? Business Partnerships Business is all about partnerships and taking a partnering approach to business relationships is a requirement. These relationships may be internal to your company or external (such as vendors). Working effectively with other teams is critical to a successful outcome. When looking at all of the moving pieces in a change of this magnitude, there are many interconnections between departments. Information should flow between departments rapidly, accurately, and timely. Training, like most other business functions, requires the active participation of many different groups. In fact, trainers often act as cross-functional liaisons between subject matter experts who provide content and guidance, line of business leaders who assist with communication and implementation planning, information technology departments who provide support and systems access, and on and on. You will find that your efforts in developing and maintaining good business partnerships throughout the life of the program will benefit you in many ways. You will: Have access to better and more timely information Have more support in resolving issues, and get help resolving problems Have more credibility during multi-functional discussions Have access to more resources, and potentially some additional budget Have a substantially better chance delivering on commitments Some of the activities that may help with business partnerships are: Liaisons with primary responsibility of working with other departments You may have someone who is the key point-of-contact (POC) for working with the IT department. Steering groups with key stakeholders This must be an active group where you ask for guidance and decisions, and they provide support when needed. In-person meetings as much as possible Find occasions to bring in remote employees, and encourage in-person attendance to meetings with other departments. The goal is to build personal relationships. This is not to say that remote team members should not be considered as part of the team. Joint status reporting / sharing responsibility for keeping executives informed Training and the line of business may prepare joint briefings for executives. Work together to spread the word! Promoting the contribution of team members from other departments Recognize people from other departments to their manager and to senior leaders across the organization. Pilot content with key leaders Put together some pilot sessions for leaders, particularly those who are responsible for the training audience. Have them participate and provide feedback. 5

6 Some example questions to ask during business partnership planning include: What level of business unit involvement is critical to the success of the training program? How will key stakeholders be involved in the review and planning process? How will you involve audience leadership in the implementation of training? How will you share accountability with the business and define responsibilities? How will communications with partners be managed? Who manages the relationships? Resource Planning How are you going to do it? How will you get it all done without burning out the entire training department? Prioritize and plan. Initially, you will decide: What work is critical to accomplish during this period of change. How much business as usual work will you retain? Will you cancel or postpone some of the projects currently in progress? Will you delay starting others? How many people and how much money will it take to get it all done? Proper resourcing is more than just the right people in the right jobs. It is also enough of the right people in the right jobs, with enough support to ensure that the team is functioning to its highest potential. Like all of the Five Requirements, resource planning must be started in the very beginning. You will likely not know exactly what, who or how much you will need, but you will need to start with an estimate. Of course, the estimate will be based on all of the information you have collected to date regarding the changes taking place, and then factoring in your past experiences, knowledge of your current team and their capabilities, and time remaining to execute the training program; all of which will likely result in the need for additional capacity and expertise. There are a few ways training teams generally increase their capacity and expertise: Carve out portions of the work and have a vendor develop distinct deliverables (Deliverablebased Outsourcing) Completely outsource the function of training for either the change event, or the business as usual training during the change event (Team Outsourcing) Augment the staff with individual resources as needed (Staff Augmentation) Partner with a company to manage an augmented training team (Staffing Partner) There are pros and cons to each approach, and a company s history and procurement policies may drive a decision one way or another. The Staffing Partner approach is not frequently used in training organizations, but has proven to be effective for these types of programs. In the Staffing Partner approach, a vendor provides a team of people to augment your training staff. The team is selected and assembled based on your criteria for skills, cultural fit, and needs of the projects. 6

7 The vendor manages the selection, onboarding, and care and feeding of the additional team members. In this approach, the Staffing Partner should be responsible for: Conducting all job posting, resume screening, and initial interviewing - The Partner can even work with you to develop detailed job screening scenarios to ensure you are getting the resources you want without having to interview yourself. Providing an orientation to consultants Your new team members show up on the first day ready to work. Managing the process of setting up a contractor to operate in the client environment The logistics of onboarding a large number of consultants can be a daunting task, but The Partner can help manage that process. Providing all administrative support to the contractors Pay, timesheets, expense reports and travel arrangements are all managed by The Partner. Working with the client to manage the scheduling and utilization of resources Because you will not know exactly what you need in the beginning, The Partner can help manage through the challenges of determining what is needed, and finding resources on short notice. Providing coaching to consultants on baseline skills as required Coaching on skills like communication, time management, teamwork, or advanced Word functions, should be The Partner s responsibility, leaving you free to focus on the execution of the program. Maintaining a field presence on-site When you have a large consultant team on site, it is important to have a Partner representative on site with them, to help you with your planning, and to help with the management of the consultants. Budgeting is obviously an important step in resource planning. Without a budget, you will not be able to have any additional resources. Budgets are typically submitted and approved before starting any significant work. A budget advocate someone at a senior level who understands the importance of properly funding the training organization, and someone who can work with the executive team to get your budget request approved - is also a very good idea. Your Program Principles will help determine the resources and budget that will be required such as: Do I need field trainers? Will equipment be needed for learning labs? How many designers will I need based on what I know of the changes and critical skills? Will technical resources be needed to create web materials? What logistical and administrative support will be needed? How will all of the individual projects be managed? What project management and coordination support will be required? Who will oversee quality and the integrity of the training program? Additional questions that will need to be answered during Resource Planning include: Will additional resources be internal or external? If external, will you follow insource, outsource, deliverable-based or time and materials models? 7

8 Do the resources need to be on-site? How will they access systems or company resources? How will they interact with Subject Matter Experts (SMEs) and Stakeholders? How will the team be organized and what are the accountabilities? Who is responsible for identifying and addressing resource issues? How will they be addressed? How will resource needs be forecasted and budgeted? How will the actual be tracked against budget? Comprehensive Quality Management Quality is inarguably an important part of everything we do in business. Comprehensive quality management as a deliberate part of an overall plan is often overlooked. There are often so many other considerations and planning needs that quality planning often does not start until there are quality issues. When we talk about quality, we mean more than eliminating typos or bugs. A Comprehensive Quality Management Plan should ensure that: Training and communications are targeted to the needs of the audience and business. A full time training team will likely know the audience well; however, o What if there are a number of new consultants on the team? o What if the training audience is part of another company? o How will knowledge about the audience and a detailed understanding of their needs be incorporated into the overall plan and every deliverable? o Does everyone on the training team understand how the training will ensure achievement of business objectives? Training and communications are in line with company culture. There is typically a great deal of stress for all involved in a large scale change. Ensuring that training methodologies and language are aligned with company culture and past methodologies will help provide some level of consistency during the transition. Reviews of deliverables must include the culture as a consideration. Information is accurate. This is another obvious statement, but inaccurate training is delivered all the time. The training team may be working with a home office group to obtain information for training materials, but does that accurately reflect how the work is done in the field? Do the people involved in the training have the right information? Processes should be in place to ensure that information is validated with multiple sources. Deliverables are in line with the overall plan. Different designers and developers may be working with different Subject Matter Experts. How will your team: o Ensure that all of the materials are true to the original program design and training plan? o Ensure that all materials fit as part of the overall curriculum? o Recognize if there is redundant information between training components? o Recognize any gaps? The quality of the whole should not be overlooked. o Ensure that deliverables are consistent and error-free. The process and time required to ensure error-free materials must be spelled out in the quality management plan. 8

9 Providing for the time and resources to ensure quality must be included in the budgeting process. The following are some mechanisms for comprehensive quality management that can be employed: Sponsors If there are a number of consultants or new employees working on training materials, consider assigning a senior training team member or manager as a sponsor for that part of the curriculum. The sponsor would primarily review materials to ensure the training was in line with the needs of the audience and company culture. The sponsor can also act as an escalation point for issues with content or subject matter expert participation. Design Manager - A design manager would review all of the deliverables to ensure they are consistent and error free as well as take the lead on ensuring the look and layout of the materials, and design and development standards, are in line with and specific to the project. They could also be the same as the Curriculum Owner. Curriculum Owner As the name implies, a curriculum owner owns the curriculum, and ensures that all deliverables are in line with the overall plan. They identify any overlaps and gaps, and take the lead on addressing training needs that pop up during the course of the project. Subject Matter Expert (SME) Integration SMEs possess the knowledge and skills necessary to a successful project, and they should be an integral part of your extended training team. Live interaction in person or through tools like Live Meeting should be promoted during content gathering and reviews as much as possible. It is also important to ensure that lack of SME participation is quickly addressed and resolved. Comprehensive Reviews Materials should be reviewed often as a regular part of the design and development process. Internal training team, peer, SME, curriculum owner, design manager and sponsor reviews should all be considered and included in the schedule. Each reviewer should be clear on their responsibilities, and what they are charged with looking for during the review. Pilots with Target Audience All material should be piloted, whether in person or online. This is not only a way to achieve accuracy and audience fit, but it is a good way to build excitement and energy for the training implementation. Escalation Process for Content Any issues with content accuracy, information gathering, pilot feedback, deviation from the Program Principles, or general quality concerns should have an escalation process. This process should be defined in advance and communicated to the whole team, and revisited often during the project to ensure compliance. Questions that will need to be answered during Comprehensive Quality Management Planning include: How will you ensure that knowledge about the company, history, audience and culture are incorporated into all of the training deliverables? How will SMEs be involved in the development and approval of training materials? What SMEs need to be involved, and how will they be managed? How will you ensure that training materials are consistent, error-free, and are in line with the initial design? How will the integrity of the curriculum be maintained? Who makes decisions about what to add or remove? What is the curriculum oversight? 9

10 Measurement, Measurement, Measurement Measurement is important only if it helps you meet the business objectives for the program. Some training teams approach measurement by first asking, What metrics do we want to track? A more appropriate approach is to begin by asking, How do we know whether or not we are meeting our business objectives? To that end, measurement should start with the activities that the team has defined as being critical to the accomplishment of the business objectives. The activities will then be tracked and measurements will be added to those activities to determine if they are being accomplished at the appropriate levels. Activities should be tracked before, during and post-implementation. They should also include both project team and training activities. One way to frame the measurements is by asking two questions: Are we getting ready? and How ready are we? Measurement by itself is not enough. Every measurement must have a specific goal attached to it. The measurements and goals will typically have a timeline established as well. (See table below for examples.) The final element of an effective measurement plan is a contingency plan. If the measurement is not in line with the goal, a contingency action should be triggered to bring the activity back in line. Since only activities critical to meeting the business objectives are being tracked, if they are out of line, they must be corrected. By having contingencies in advance, action can be immediately implemented. Additionally, the act of contingency planning often improves the initial implementation and reduces the chance of a problem in the first place. Some examples of measurement items are: Activity Measurements Goals Contingencies Final training deliverable Pilot training session Completion of specific e-learning module with confidence survey % complete, status and trend, issues, quality review outcomes Completion of pilot, scores on post pilot survey, feedback from participants, trainer observation comments % of total audience complete, # technical issues, # support calls, Survey scores % complete over time, no issues, defined quality expectations No show stopper comments, less than 5% content changes, participants excited to recommend training Goals for completions over time with end date, Tech and support call threshold, Expected range for confidence scores Stakeholder escalation process, schedule alternatives, staffing changes, implementation changes Resourcing identified to rework content, secondary pilot date, implementation changes Dev team on standby to fix tech issues, Field leadership escalation path to drive completions, follow up plan for low confidence 10

11 Activity Measurements Goals Contingencies Systems conversion event # and types of calls into support areas, volume of operations business, issue escalations No global issues resulting from training gaps, no escalated issues Trainers and developers on standby to address critical gaps, trainers deployed key locations for rapid response, augmentation plan for support areas Questions to be answered during Measurement Planning include: Will you have a detailed project schedule, and how will you know it is on track? How will you know if the audience is taking the steps to get ready for the event? How will you know if the audience is ready for the event? How will you provide information that is critical to make decisions throughout the process? What are the sources and recipients of information? How will you manage information flow? Additional Considerations Here are some additional considerations when planning your training program: It is not over at the BIG BANG If there is a conversion event, the training plan should not end there. If you have used a critical skills filter, there is still training to be delivered that is important to the audience. There will also be issues that pop up that were not anticipated. The plan should include staffing that is set aside to deal with the issues, or other work that can be prioritized below the issues. Plan for post event support No matter how good the training program is, employees will forget some of it, or will encounter a critical need that was not covered in training. Post event support can help minimize the operational impact. Issue information flow How will you hear about issues that come up either as a result of training, or that can be addressed through the training function? Are you tied into the IT helpdesk, any centralized issues centers, or support areas? Training should be monitoring the information to help the organization quickly close any post conversion/event gaps. Plan for a buddy system Buddy systems are a great way for front line leaders to get help from other people in their roles. Pair up managers and supervisors whenever possible and encourage the use of the buddy relationship. If a merger, partner roles from both legacy organizations Involvement from both organizations is critical. Each company has a perspective that is important. Ignoring or not including half of the equation can create difficulties. 11

12 Parting Thoughts These are obviously not the only planning aspects of a well-designed and executed training program. We feel, however, that if you focus on these Five Requirements, you will have a much greater potential to meet and exceed the desired program outcomes. The recommendations outlined in this document have been formulated after a significant number of hours of program management and team leadership in these types of programs, and a substantial amount of performance analysis and after action review. We hope that you are able to make your life easier by avoiding some of the lessons we learned over time. About the Authors Tom Allen is a Managing Director for Wells Fargo Advisors Financial Advisor Training Department. With more than 17 years experience in the training and development space, Tom has led several large training initiatives for the firm, including merger training on back-to-back mergers, training for new financial advisors, and implementation of the firm s corporate university. Tom was also cited in 2007 by the St. Louis Business Journal s 40 Under 40, a list highlighting the top executives in the St. Louis area under age 40. Tom holds an M.A. in English Literature from University of Missouri-Columbia, and a B.A. in English and Economics from Vanderbilt University. Todd Fleming, a certified Project Management Professional (PMP ), is currently a program and Program Manager and Senior Consultant for VisionCor Inc., a consulting firm specializing in providing capacity and expertise. In this role, Todd is responsible for planning and directing large and complex training programs and projects. Todd is an experienced program and project manager. He has personally managed a wide variety of projects totaling well over 10,000 hours of direct project management experience. Todd has managed teams of project managers, instructional designers, trainers, technical developers and IT professionals. He has led training project teams with over 100 members 12

Role and Skill Descriptions. For An ITIL Implementation Project

Role and Skill Descriptions. For An ITIL Implementation Project Role and Skill Descriptions For An ITIL Implementation Project The following skill traits were identified as fairly typical of those needed to execute many of the key activities identified: Customer Relationship

More information

SharePoint Project Management: The Key to Successful User Adoption

SharePoint Project Management: The Key to Successful User Adoption SharePoint Project Management: The Key to Successful User Adoption Leanne M. Bateman, PMP February 2012 Leanne Bateman, 2012. All rights reserved. Table of Contents ABSTRACT... 3 ABOUT THE AUTHOR... 3

More information

Measurement Program Implementation Approaches

Measurement Program Implementation Approaches CHAPTER SIX Measurement Program Implementation Approaches Lori Holmes Introduction Measurement processes have become a necessary and important part of today s software organization. To compete in an ever-changing,

More information

G. Michael Hendon, Director McDonald s Worldwide Training Learning and Development

G. Michael Hendon, Director McDonald s Worldwide Training Learning and Development Integrating e-learning into McDonald s Worldwide On-the-Job Restaurant Learning System (original draft provided to Pearson Prentice Hall for publication in Workplace Training and Learning, Cases from Cross-Cultural

More information

SharePoint Project Management: The Key to Successful User Adoption

SharePoint Project Management: The Key to Successful User Adoption SharePoint Project Management: The Key to Successful User Adoption Leanne M. Bateman, PMP Principal Consultant February 2012 www.beaconstrategy.com Table of Contents ABSTRACT... 3 ABOUT THE AUTHOR... 3

More information

Business Analyst Position Description

Business Analyst Position Description Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...

More information

Expert Reference Series of White Papers. Intersecting Project Management and Business Analysis

Expert Reference Series of White Papers. Intersecting Project Management and Business Analysis Expert Reference Series of White Papers Intersecting Project Management and Business Analysis 1-800-COURSES www.globalknowledge.com Intersecting Project Management and Business Analysis Daniel Stober,

More information

Business Logistics Specialist Position Description

Business Logistics Specialist Position Description Specialist Position Description March 23, 2015 MIT Specialist Position Description March 23, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level

More information

Applying a Proven Learning Strategy in Bank Acquisition Environments

Applying a Proven Learning Strategy in Bank Acquisition Environments in Bank Acquisition Environments Nan Orth Lisa Schramm FIS Education and Training 800.822.6758 Executive Takeaways Effective training has a direct impact on individual performance. In turn, an organization

More information

Business Continuity Position Description

Business Continuity Position Description Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary

More information

Project Managing Business Process Improvement Initiatives

Project Managing Business Process Improvement Initiatives Overview Project Managing Business Process Improvement Initiatives Gina Abudi Business process improvement initiatives prove to be some of the more challenging projects for project managers. This is for

More information

Achieving Business Analysis Excellence

Achieving Business Analysis Excellence RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence 11 Canal Center Plaza Alexandria, VA 22314 HQ 703-548-7006 Fax 703-684-5189

More information

Achieving Business Analysis Excellence

Achieving Business Analysis Excellence RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence Susan Martin March 5, 2013 11 Canal Center Plaza Alexandria, VA

More information

Business Intelligence Analyst Position Description

Business Intelligence Analyst Position Description Business Intelligence Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level

More information

IT Risk & Security Specialist Position Description

IT Risk & Security Specialist Position Description Specialist Position Description February 9, 2015 Specialist Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level

More information

Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan

Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan Establish Collaborative Strategies to Better Manage a Global Vendor Network Devise a Proper Float Plan CBI s Biopharmaceutical Forum on Clinical and Commercial Global Supply Chain Excellence Sandy Onorato

More information

The Future of Census Bureau Operations

The Future of Census Bureau Operations The Future of Census Bureau Operations Version 1.0 April 25, 2013 The Future of Census Bureau Operations Page ii [This page intentionally left blank] The Future of Census Bureau Operations Page iii Document

More information

Project Governance Plan Next Generation 9-1-1 Project Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1)

Project Governance Plan Next Generation 9-1-1 Project Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1) Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1) Date: October 1, 2014 Version: 3.1 DOCUMENT REVISION HISTORY Version Date Changes Updated By 0.1 02/13/014 Initial

More information

Change Management Is A Behavioral Competency You Can Develop

Change Management Is A Behavioral Competency You Can Develop Change Management Is A Behavioral Competency You Can Develop Hinda K. Sterling Herbert L. Selesnick & Sterling Selesnick, INC Change Management Is A Behavioral Competency You Can Develop This article is

More information

Department of Technology & Information

Department of Technology & Information Change Management Standards Major Projects Department of Technology & Information December 2003 Pam Waters, Change Management Team Leader Office of Major Projects Department of Technology & Information

More information

EXECUTIVE BEHAVIORAL INTERVIEW GUIDE

EXECUTIVE BEHAVIORAL INTERVIEW GUIDE EXECUTIVE BEHAVIORAL INTERVIEW GUIDE INTERVIEW GUIDE INSTRUCTIONS: This Interview Guide is intended to help hiring executives conduct behavioral interviews for executive classifications covered by the

More information

Project Knowledge Areas

Project Knowledge Areas From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.

More information

Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing

Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the

More information

Risk and Contingency Planning. Today s Topics. Key Terms. A Vital Component of Your ICD-10 Program

Risk and Contingency Planning. Today s Topics. Key Terms. A Vital Component of Your ICD-10 Program Risk and Planning A Vital Component of Your ICD-10 Program Today s Topics Key Terms Why is Risk Management Critical for ICD-10? Effective Risk Management and Best Concepts ICD-10 Risk Management Examples

More information

IT Service Provider and Consumer Support Engineer Position Description

IT Service Provider and Consumer Support Engineer Position Description Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...

More information

Essential Elements for Any Successful Project

Essential Elements for Any Successful Project In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable

More information

DESIGNING YOUR EMR TRAINING PROGRAM

DESIGNING YOUR EMR TRAINING PROGRAM DESIGNING YOUR EMR TRAINING PROGRAM By: Larry Mercer, Ph.D., MBA, MA, Ed.D. & Philip Felt, PMP, MBA Even the best-planned, financed, and resourced electronic medical record (EMR) implementation projects

More information

The Evolution of the HR Business Partner Role

The Evolution of the HR Business Partner Role The Evolution of the HR Business Partner Role A Process for Assessing and Transforming the HR Business Partner in a Shared Services Model June 2012 Copyright 2012 by ScottMadden, Inc. All rights reserved.

More information

AdPro s Prosci Change Management Certification Program. Introduction. Program Overview

AdPro s Prosci Change Management Certification Program. Introduction. Program Overview AdPro s Prosci Change Management Certification Program Introduction The ultimate benefit from any change, i.e., the ROI, depends upon an organization s competency in managing the people side of change.

More information

Proven Best Practices for a Successful Credit Portfolio Conversion

Proven Best Practices for a Successful Credit Portfolio Conversion Proven Best Practices for a Successful Credit Portfolio Conversion 2011 First Data Corporation. All trademarks, service marks and trade names referenced in this material are the property of their respective

More information

Enhance State IT Contract Expertise

Enhance State IT Contract Expertise Enhance State IT Contract Expertise Chris Estes State Chief Information Officer Office of Information Technology Services March 2015 1 P a g e Table of Contents 1. Legislative Request... 3 2. Introduction...

More information

Data Conversion Best Practices

Data Conversion Best Practices WHITE PAPER Data Conversion Best Practices Thomas Maher and Laura Bloemer Senior Healthcare Consultants Hayes Management WHITE PAPER: Data Conversion Best Practices Background Many healthcare organizations

More information

How To Successfully Create An Internal Project Management Certification Program For Your State

How To Successfully Create An Internal Project Management Certification Program For Your State How To Successfully Create An Internal Project Management Certification Program For Your State By Dr. Keith Mathis, PMP The Mathis Group, Inc 106 Lakeview Woods Eureka, MO 63025 1-800-224-3731 keith@themathisgroup.com

More information

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,

More information

Creating Customized Training for a Leading Insurance Company

Creating Customized Training for a Leading Insurance Company Customer Success Stories TEKsystems Global Services Creating Customized Training for a Leading Insurance Company FINANCIAL SERVICES TRAINING AND EDUCATION SERVICES Executive Summary A Fortune 50 insurance

More information

BUSINESS PROCESS OPTIMIZATION IN THE CONTACT CENTER

BUSINESS PROCESS OPTIMIZATION IN THE CONTACT CENTER BUSINESS PROCESS OPTIMIZATION IN THE CONTACT CENTER By Brian Hinton Principal Consultant Strategic Contact, Inc. June 2010 2010 Strategic Contact, Inc. All Rights Reserved WHITE PAPER ABOUT THE AUTHOR

More information

Organizational Change Management Standards. Table of Contents

Organizational Change Management Standards. Table of Contents Organizational Change C Management M Standards S Office O of Major Projects Department of Technology & Information October 2008 Pam Waters, Organizational Change Management Team Leader Office of Major

More information

MNLARS Project Audit Checklist

MNLARS Project Audit Checklist Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?

More information

Sample Document. Onboarding: The Essential Rules For A Successful Onboarding Program. Student Manual. www.catraining.co.uk

Sample Document. Onboarding: The Essential Rules For A Successful Onboarding Program. Student Manual. www.catraining.co.uk The Essential Rules For A Successful Onboarding Program Tel: 020 7920 9500 Onboarding: The Essential Rules For A Successful Onboarding Program www.catraining.co.uk Student Manual Copyright 2014 Charis

More information

GETTING THE MOST OUT OF YOUR

GETTING THE MOST OUT OF YOUR white paper GETTING THE MOST OUT OF YOUR EPIC EMR TRAINING PROGRAM written by Larry Mercer, PhD, MBA, MA, EdD Philip Felt, PMP, MBA Noell R. Snider, MEd Introduction Even the best-planned, financed, and

More information

strategic workforce planning: building blocks to success

strategic workforce planning: building blocks to success strategic workforce planning: building blocks to success Foreword by Tom Kaminsky The ability to attract and retain people with valuable skills that meet business objectives is vital for companies seeking

More information

Enterprise Data Governance

Enterprise Data Governance DATA GOVERNANCE Enterprise Data Governance Strategies and Approaches for Implementing a Multi-Domain Data Governance Model Mark Allen Sr. Consultant, Enterprise Data Governance WellPoint, Inc. 1 Introduction:

More information

Show your value, grow your business:

Show your value, grow your business: Show your value, grow your business: A SUPPLIER GUIDE TO MOVE FROM A TRANSACTIONAL PROVIDER TO A STRATEGIC PARTNER KAREN A. CALINSKI INTRODUCTION /02 At KellyOCG we take a holistic approach to talent sourcing

More information

OE PROJECT CHARTER TEMPLATE

OE PROJECT CHARTER TEMPLATE PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,

More information

Leadership Competency Self Assessment

Leadership Competency Self Assessment USDA Virtual University School of Talent Management Leadership Essentials Certificate Program Leadership Competency Self Assessment Building Blocks for Workforce Development Based on OPM Competencies Updated:

More information

PRO-NET 2000. A Publication of Building Professional Development Partnerships for Adult Educators Project. April 2002

PRO-NET 2000. A Publication of Building Professional Development Partnerships for Adult Educators Project. April 2002 Professional Development Coordinator Competencies and Sample Indicators for the Improvement of Adult Education Programs A Publication of Building Professional Development Partnerships for Adult Educators

More information

Applies from 1 April 2007 Revised April 2008. Core Competence Framework Guidance booklet

Applies from 1 April 2007 Revised April 2008. Core Competence Framework Guidance booklet Applies from 1 April 2007 Revised April 2008 Core Competence Framework Guidance booklet - Core Competence Framework - Core Competence Framework Core Competence Framework Foreword Introduction to competences

More information

The Blending of Traditional and Agile Project Management

The Blending of Traditional and Agile Project Management 1 of 6 The Blending of Traditional and Agile Project Management By Kathleen Hass Traditional project management involves very disciplined and deliberate planning and control methods. With this approach,

More information

DevOps Engineer Position Description

DevOps Engineer Position Description Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...

More information

Identity & Access Management Case Study & Lessons Learned. Prepared by Tariq Jan

Identity & Access Management Case Study & Lessons Learned. Prepared by Tariq Jan Identity & Access Management Case Study & Lessons Learned Prepared by Tariq Jan Investment Bank Case Study Top 5 leading global financial services firm $116 billion in revenue $2 trillion in assets 220k

More information

Guide to Getting Started with the CommIT Pilot

Guide to Getting Started with the CommIT Pilot Guide to Getting Started with the CommIT Pilot Fall 2013 2 Table of Contents What is the CommIT Pilot?... 3 What is the scope for the Pilot?... 3 What is the timeframe for the Pilot?... 5 What are the

More information

White Paper. Table of Contents

White Paper. Table of Contents Table of Contents Introduction 1 Best Practices for ERP Implementation 2 Understand business processes and key requirements. 2 Build a business case for ERP with a positive ROI 3 Ensure proper project

More information

Internship Guide. Get Started

Internship Guide. Get Started Internship Guide This guide provides a roadmap for any company, no matter the size of the business or the industry. Whether you re just getting started or already have an internship program that you want

More information

Implementing Your EHR

Implementing Your EHR Implementing Your EHR Webinar Schedule Optimizing your EHR for Quality Improvement March 23 and 26 Session Objectives Apply best practices for system implementation Evaluate staffing needs for the EHR

More information

ERP Software and Your Business

ERP Software and Your Business CRM-ERP.com ERP Software and Your Business Choosing and Implementing the ERP Software Solution that Provides the Most Benefit to Your Company White Paper June 2008 ERP Software and Your Business Choosing

More information

Onboarding training program provides quantified results that add to recruiting firm s bottom line.

Onboarding training program provides quantified results that add to recruiting firm s bottom line. Onboarding training program provides quantified results that add to recruiting firm s bottom line. Our goal was to create a teachable, understandable, impactful, businessdriving program. What we wanted

More information

DEFENSE ACQUISITION WORKFORCE

DEFENSE ACQUISITION WORKFORCE United States Government Accountability Office Report to Congressional Committees December 2015 DEFENSE ACQUISITION WORKFORCE Actions Needed to Guide Planning Efforts and Improve Workforce Capability GAO-16-80

More information

Organizational Change Management Methodology. Tools and Techniques to aid Project Implementation

Organizational Change Management Methodology. Tools and Techniques to aid Project Implementation Organizational Change Management Methodology Tools and Techniques to aid Project Implementation Today s Objectives Discuss the Organizational Change Management team and explore ways Organizational Change

More information

Realizing Hidden Value: Optimizing Utility Field Service Performance by Measuring the Right Things

Realizing Hidden Value: Optimizing Utility Field Service Performance by Measuring the Right Things Energy and Utility Insights Realizing Hidden Value: Optimizing Utility Field Service Performance by Measuring the Right Things Utilities Realizing Hidden Value About the Author Rob Milstead serves as the

More information

HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM

HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM FORTUNE 500 HIGH-TECH EQUIPMENT AND SERVICES COMPANY Process-focused job description indicates low potential for career enhancement and discourages talent from

More information

Talent & Organization. Organization Change. Driving successful change to deliver improved business performance and achieve business benefits

Talent & Organization. Organization Change. Driving successful change to deliver improved business performance and achieve business benefits Talent & Organization Organization Change Driving successful change to deliver improved business performance and achieve business benefits Accenture Organization Change Distinctive solutions for transformational,

More information

ASAP- Accelerated SAP

ASAP- Accelerated SAP ASAP- Accelerated SAP Vanessa Hong What is ASAP? What is ASAP Methodology? ASAP, accelerated SAP implement, means to go through the SAP implementation process efficiently. Accelerated SAP Methodology is

More information

A Human Resource Capacity Tool for First Nations // planning for treaty

A Human Resource Capacity Tool for First Nations // planning for treaty A Human Resource Capacity Tool for First Nations // planning for treaty table of contents Introduction //...3 Tools //... 9 HR Planning Timeline... 9 Stage 1 Where are we now?...11 Stage 2 Where do we

More information

Ten Steps to Comprehensive Project Portfolio Management Part 8 More Tips on Step 10 By R. Max Wideman Benefits Harvesting

Ten Steps to Comprehensive Project Portfolio Management Part 8 More Tips on Step 10 By R. Max Wideman Benefits Harvesting August 2007 Ten Steps to Comprehensive Project Portfolio Management Part 8 More Tips on Step 10 By R. Max Wideman This series of papers has been developed from our work in upgrading TenStep's PortfolioStep.

More information

Revised Body of Knowledge And Required Professional Capabilities (RPCs)

Revised Body of Knowledge And Required Professional Capabilities (RPCs) Revised Body of Knowledge And Required Professional Capabilities (RPCs) PROFESSIONAL PRACTICE Strategic contribution to organizational success RPC:1 Contributes to the development of the organization s

More information

730 Yale Avenue Swarthmore, PA 19081 www.raabassociatesinc.com info@raabassociatesinc.com

730 Yale Avenue Swarthmore, PA 19081 www.raabassociatesinc.com info@raabassociatesinc.com Lead Scoring: Five Steps to Getting Started 730 Yale Avenue Swarthmore, PA 19081 www.raabassociatesinc.com info@raabassociatesinc.com Introduction Lead scoring applies mathematical formulas to rank potential

More information

KMS Implementation Roadmap

KMS Implementation Roadmap KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5

More information

The New Value of Change Management: Success at Microsoft

The New Value of Change Management: Success at Microsoft The New Value of Change Management: Success at Microsoft by Molly Cooper, Microsoft IT Page 1 of 8 Summary Microsoft recently completed a significant IT transformation effort by replacing the existing

More information

Agile Master Data Management TM : Data Governance in Action. A whitepaper by First San Francisco Partners

Agile Master Data Management TM : Data Governance in Action. A whitepaper by First San Francisco Partners Agile Master Data Management TM : Data Governance in Action A whitepaper by First San Francisco Partners First San Francisco Partners Whitepaper Executive Summary What do data management, master data management,

More information

Business Continuity Planning. Description and Framework. White Paper. Preface. Contents

Business Continuity Planning. Description and Framework. White Paper. Preface. Contents Comprehensive Consulting Solutions, Inc. Business Savvy. IT Smart. Business Continuity Planning White Paper Published: April 2001 (with revisions) Business Continuity Planning Description and Framework

More information

ID Task Name Time Pred

ID Task Name Time Pred 0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive

More information

IT GOVERNANCE ISSUES IN THE INSTITUTIONS WE HAVE AUDITED: LESSONS LEARNED

IT GOVERNANCE ISSUES IN THE INSTITUTIONS WE HAVE AUDITED: LESSONS LEARNED CONTRALORIA GENERAL DE LA REPUBLICA DE COSTA RICA 5TH PERFORMANCE AUDITING SEMINAR INTOSAI STANDING COMMITTEE ON IT AUDIT MAJOR THEME: IT GOVERNANCE IT GOVERNANCE ISSUES IN THE INSTITUTIONS WE HAVE AUDITED:

More information

Human Performance & the Role of Human Resources

Human Performance & the Role of Human Resources DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Human Performance & the Role of Human Resources Ms. Cheryl Steptoe-Simon July 20, 2016 Human Performance Functions Human Performance Components

More information

Project Management Certificate (IT Professionals)

Project Management Certificate (IT Professionals) Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.

More information

White Paper Build A Change Management Office

White Paper Build A Change Management Office Building Change Capability We make it happen. Better. White Paper Build A Change Management Office 9 Steps to Make Your Change Efforts Stick May 2014 Better Change Management Developing a Change Management

More information

Business Relationship Manager Position Description

Business Relationship Manager Position Description Manager Position Description February 9, 2015 Manager Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...

More information

CRM SUCCESS GUIDELINES

CRM SUCCESS GUIDELINES CRM SUCCESS GUIDELINES Provided to You By: Integrated Sales Management, Inc. Helping You Grow! CRM Success Guidelines Customer Relationship Management (CRM) has evolved dramatically recently as many companies

More information

Aligning Development to Ensure Product Success Performance Genesis

Aligning Development to Ensure Product Success Performance Genesis Aligning Development to Ensure Product Success Performance Genesis The development and deployment of successful products in a complex and evolving market frequently leads to failures in the form of wasted

More information

Self-Assessment A Product Audit Are You Happy with Your Product Results

Self-Assessment A Product Audit Are You Happy with Your Product Results Self-Assessment A Product Audit Are You Happy with Your Product Results When was the last time you really assessed your products and your organization s ability to create and deliver them to the marketplace?

More information

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria Characteristic Best Practice Estimate Package Component / GAO Audit Criteria Comprehensive Step 2: Develop the estimating plan Documented in BOE or Separate Appendix to BOE. An analytic approach to cost

More information

Talent & Organization. Organization Change. Driving successful change to deliver improved business performance and achieve business benefits

Talent & Organization. Organization Change. Driving successful change to deliver improved business performance and achieve business benefits Talent & Organization Organization Change Driving successful change to deliver improved business performance and achieve business benefits Accenture Organization Change Distinctive solutions for transformational,

More information

When companies purchase an integrated learning

When companies purchase an integrated learning Feature 2. Project team members are required to perform their regular responsibilities in addition to committing their time to the implementation. Organizations can overcome these challenges if they find

More information

DITA Adoption Process: Roles, Responsibilities, and Skills

DITA Adoption Process: Roles, Responsibilities, and Skills DITA Adoption Process: Roles, Responsibilities, and Skills Contents 2 Contents DITA Adoption Process: Roles, Responsibilities, and Skills... 3 Investigation Phase... 3 Selling Phase...4 Pilot Phase...5

More information

Presented By: Leah R. Smith, PMP. Ju ly, 2 011

Presented By: Leah R. Smith, PMP. Ju ly, 2 011 Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a

More information

Business Intelligence Engineer Position Description

Business Intelligence Engineer Position Description Business Intelligence Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

Cisco Change Management: Best Practices White Paper

Cisco Change Management: Best Practices White Paper Table of Contents Change Management: Best Practices White Paper...1 Introduction...1 Critical Steps for Creating a Change Management Process...1 Planning for Change...1 Managing Change...1 High Level Process

More information

As SOA momentum is picking up in the

As SOA momentum is picking up in the SETLabs Briefings VOL 5 NO 1 Jan - Mar 2007 SOA Technology Competency Center By Shreyas Kamat Organizational need to manage SOA transformation effectively has bolstered the growth of SOA TCC concept As

More information

PROJECT RISK MANAGEMENT

PROJECT RISK MANAGEMENT PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized

More information

DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN. Version : 1.0 Date : April 2009 : Pink Elephant

DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN. Version : 1.0 Date : April 2009 : Pink Elephant DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN Version : 1.0 Date : April 2009 Author : Pink Elephant Table of Contents 1 Executive Overview... 3 2 Manager Responsibilities... 4 2.1 Before

More information

Guidelines For A Successful CRM

Guidelines For A Successful CRM Guidelines For A Successful CRM Salesboom.com Many organizations look to CRM software solutions to address sales or maybe customer service deficiencies or to respond to pressures from outside sources in

More information

PHASE 6: DEVELOPMENT PHASE

PHASE 6: DEVELOPMENT PHASE PHASE 6: DEVELOPMENT PHASE The Phase features a key step in the project: system construction. The previous phases lay the foundation for system development; the following phases ensure that the product

More information

Computing & Communications Services

Computing & Communications Services 2010 Computing & Communications Services 2010 / 10 / 04 Final Kent Percival, M.Sc., P.Eng. Defining the Value of the Business Analyst In achieving its vision, key CCS partnerships involve working directly

More information

Managing Change in ERP Projects

Managing Change in ERP Projects Managing Change in ERP Projects Ask the executive sponsor of an enterprise resource planning (ERP) project about the most important factors for success, and odds are good that change management will be

More information

Creating an Effective Mystery Shopping Program Best Practices

Creating an Effective Mystery Shopping Program Best Practices Creating an Effective Mystery Shopping Program Best Practices BEST PRACTICE GUIDE Congratulations! If you are reading this paper, it s likely that you are seriously considering implementing a mystery shop

More information

Mini-Guide to Selecting and Working with Consultants

Mini-Guide to Selecting and Working with Consultants Mini-Guide to Selecting and Working with Consultants Before Contacting a Consultant What to expect from a consultant Thinking through your needs Interviewing Consultants Describe what will happen during

More information

Enhancing Outsourcing Relationship Management Capabilities: Driving Greater Value from AllianceBernstein s Global Operations

Enhancing Outsourcing Relationship Management Capabilities: Driving Greater Value from AllianceBernstein s Global Operations Enhancing Outsourcing Relationship Management Capabilities: Driving Greater Value from AllianceBernstein s Global Operations A Vantage Partners Case Study 2011 Vantage Partners, LLC. All rights reserved.

More information

15 Principles of Project Management Success

15 Principles of Project Management Success 15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.

More information

Corporate Human Resources Internal Role Profile

Corporate Human Resources Internal Role Profile Corporate Human Resources Internal Role Profile Director, Organizational Development Role Purpose: Reporting to the Executive Director, Talent Management, this position provides leadership and functional

More information

PROJECT AUDIENCE REQUEST FOR PROPOSAL: Business Plan

PROJECT AUDIENCE REQUEST FOR PROPOSAL: Business Plan CONTENTS Introduction Proposal Submission deadline Background Summary of Goals Project Details o Business Plan Participants Financial Planning o Business structure/leadership model Framework Board governance/structure

More information